Interstate 99
Route information | |||||||
---|---|---|---|---|---|---|---|
Length | 98.34 mi[1] (158.26 km) | ||||||
Existed | 1998[2]–present | ||||||
NHS | Entire route | ||||||
Southern segment | |||||||
Length | 85.74 mi[1] (137.99 km) | ||||||
South end | US 220 / US 220 Bus. near Bedford, PA | ||||||
Major intersections |
| ||||||
North end | US 220 / PA 26 near Bellefonte, PA | ||||||
Northern segment | |||||||
South end | I-180 / US 15 / US 220 in Williamsport, PA | ||||||
Major intersections |
| ||||||
North end | I-86 / NY 17 / NY 352 / NY 415 near Painted Post, NY | ||||||
Location | |||||||
Country | United States | ||||||
States | Pennsylvania, New York | ||||||
Counties | PA: Bedford, Blair, Centre NY: Steuben | ||||||
Highway system | |||||||
|
Interstate 99 (I-99) is an Interstate Highway in the United States with two segments: one located in central Pennsylvania and the other in northern Pennsylvania into southern New York along US 15.[3] The southern terminus of the route is near exit 146 of the Pennsylvania Turnpike (I-70/I-76) north of Bedford, where the road continues south as U.S. Route 220 (US 220). The northern terminus of the Pennsylvania segment is at an at-grade intersection with Musser Lane near I-80 near Bellefonte. The northern segment is entirely concurrent with US 15, beginning at I-180 in Williamsport northward into New York to an interchange with I-86 in Corning. Within Pennsylvania, I-99 passes through Altoona and State College—the latter home to the Pennsylvania State University—and is entirely concurrent with US 220.
In November 2024, the northern segment was extended down US 15 to I-180 in Williamsport, entirely concurrent with US 15.[4] Long-term plans call for the two segments of I-99 to be connected using portions of I-80 and US 220 through Pennsylvania. The only current progress on the connection is the direct access interchange at I-80.
Unlike most Interstate Highway numbers, which were assigned by the American Association of State Highway and Transportation Officials (AASHTO) to fit into a grid, I-99's number was written into Section 332 of the National Highway System Designation Act of 1995 by Bud Shuster, then-chair of the US House Committee on Transportation and Infrastructure, the bill's sponsor, and the representative of the district through which the highway runs. I-99 breaks the AASHTO numbering pattern associated with Interstate Highways, as it would be expected to lie east of I-97 but instead lies east of I-79 and west of I-81.
Route description
mi[1] | km | |
---|---|---|
PA | 85.74 | 137.99 |
NY | 12.60 | 20.28 |
Total | 98.34 | 158.26 |
Southern segment
I-99 begins at an indirect interchange with US 220 and the Pennsylvania Turnpike (I-70/I-76) north of Bedford. It begins concurrent with US 220, which continues south from the interchange toward the Maryland state line as a two-lane highway known as the Appalachian Thruway. To access the turnpike, drivers are required to use a short segment of US 220 Business (US 220 Bus.). North of the turnpike junction, the freeway becomes the Bud Shuster Highway as it heads through a rural portion of Bedford County. It connects to Pennsylvania Route 56 (PA 56) just west of Bedford County Airport at exit 3 and PA 869 at exit 7 before crossing into Blair County. Here, it meets PA 164 north of East Freedom at exit 23 prior to entering the Altoona area.[5]
In Hollidaysburg, a borough south of the city, I-99 and US 220 connect to US 22 at exit 28, a large modified trumpet interchange. This junction allows travelers to head west toward Ebensburg, Johnstown, and Pittsburgh. The freeway continues to Altoona itself, where it indirectly connects to PA 36 via exit 32. Unlike the original routing of US 220 which goes through the city center, I-99 and US 220 mostly bypass it to the east, connecting to the city via streets leading eastward from the downtown district. At the northern edge of Altoona, PA 764 joins the old alignment of US 220 and parallels I-99 north for three miles (4.8 km) toward Bellwood. PA 764 leaves old US 220 about two miles (3.2 km) south of Bellwood, however, and terminates at I-99 exit 39. Bellwood itself is served by exit 41, which leads to PA 865.[5]
The highway veers northeastward from Bellwood to serve the borough of Tyrone, located at the junction of old US 220 and PA 453. Access to the borough is made by way of exit 48, which serves PA 453. Past Tyrone, I-99 and US 220 head through sparsely populated areas of Blair and Centre counties. For this reason, only three exits exist between Tyrone and State College: exit 52, serving PA 350 and the small community of Bald Eagle, and exits 61 and 62, which connect to US 322 and the borough of Port Matilda. Here, US 322 joins I-99 and US 220 and follows them eastward to the State College area.[5]
At exit 68 (US 322 Bus.), I-99 merges into the Mount Nittany Expressway, an older, northerly bypass of State College. I-99, US 220, and US 322 follow the expressway to the Mount Nittany Interchange, a directional T interchange located on the northern fringe of the Pennsylvania State University campus. Beaver Stadium, the home of the Penn State Nittany Lions football team, is visible from I-99 at this point. US 322 continues east through the interchange to follow the Mount Nittany Expressway while I-99 and US 220 split from US 322 and head northeastward toward Pleasant Gap, which I-99 connects to via exit 81 and PA 26. At this point, PA 26 joins the freeway and follows it to Bellefonte, served by exit 83 and PA 550. The southern segment of I-99 ends about 1.75 miles (2.82 km) later at an intersection with Musser Lane though the divided highway continues 0.33 miles (0.53 km) northeast to an interchange with I-80, where PA 26 continues north and US 220 joins I-80 east.[5]
Northern segment
The northern segment of I-99 is entirely concurrent with US 15 and starts at the junction of US 220, US 15, and I-180. I-99 crosses through mountainous terrain in Lycoming and Tioga counties, bypassing Mansfield. The route crosses the Pennsylvania–New York border north of Lawrenceville, Pennsylvania. A four-lane freeway through the Steuben County town of Lindley, I-99 crosses through a rock cut, making a large bend to the north and bypassing the hamlet of Presho. The freeway enters a partial cloverleaf interchange with County Route 5 (CR 5; Smith Road). After CR 5, I-99 turns northeast through the town of Erwin, running to the west of the Indian Hills Golf Club. Making a gradual bend further to the northeast, the freeway crosses the Canisteo River and enters the hamlet of Erwins, where it enters a diamond interchange with New York State Route 417 (NY 417; Addison Road). After NY 417, it then turns alongside Norfolk Southern Railway's Southern Tier Line (former Erie Railroad main line). Now paralleling the tracks and NY 417, I-99/US 15 crosses through Erwin, entering exit 11, which connects to NY 417 once again, next to Gang Mills Yard,[6] the site of former Painted Post station.[7]
After Gang Mills Yard, I-99 crosses through the Gang Mills section of Erwin, entering a large interchange at the northern end of the neighborhood. Signed exit 12, this interchange serves CR 107 (Robert Dann Drive) via NY 417. After CR 107, I-99 enters a large interchange that utilizes several flyover ramps between I-99, US 15, I-86, and NY 17 (Southern Tier Expressway). Ramps are also present, connecting to NY 352. This interchange serves as the northern terminus of both I-99 and US 15.[6]
History
Origins
Corridor O of the Appalachian Development Highway System was assigned in 1965,[citation needed] running from Cumberland, Maryland (Corridor E, now I-68) to Bellefonte (I-80) along US 220.[8] The portion in Pennsylvania, from Bedford north to Bald Eagle, was upgraded to a freeway in stages from the 1960s to the 1990s. The first section, from US 30 in Bedford to PA 56 near Cessna, opened in the latter half of the 1960s.[9][10] Two more sections—from PA 56 north to modern exit 15 in Blair County and from Charlottsville (exit 45) to Bald Eagle—were completed in the 1970s.[10][11] The portion between exit 15 and Altoona (exit 33) was finished in the 1980s[11][12] while the segment between modern exits 33 and 45 was opened by 1997.[13]
In 1991, the Intermodal Surface Transportation Efficiency Act (ISTEA) was signed into law.[14] It included a number of High Priority Corridors, one of which—Corridor 9—ran along US 220 from Bedford to Williamsport, and then north on US 15 to Corning, New York.[15] The National Highway System Designation Act of 1995 amended ISTEA; among these amendments were that "the portion of the route referred to in subsection (c)(9) [Corridor 9] is designated as Interstate Route I-99."[16] This was the first interstate highway number to be written into law rather than to be assigned by AASHTO. The number was specified by Representative Bud Shuster, who said that the standard spur numbering was not "catchy"; instead, I-99 was named after a street car, No. 99, that took people from Shuster's hometown of Glassport to McKeesport. I-99 breaks the AASHTO numbering pattern associated with interstate highways, since it lies east of I-79 but west of I-81 (the number suggests it would be located very close to the Atlantic Ocean, east of I-95).[17]
Designation and Bald Eagle Mountain
On November 6, 1998, AASHTO formally approved the I-99 designation, which initially extended 51.2 miles (82.4 km) from the Pennsylvania Turnpike in Bedford to PA 350 in Bald Eagle.[2] In 2002, plans were set in motion to extend I-99 northeast from Bald Eagle to State College via Port Matilda.[18] The extension was fraught with issues, however. The proposed alignment for the highway north to Port Matilda proved to be controversial: while environmentalists called for I-99 to be constructed in the valley below Bald Eagle Mountain, the Pennsylvania Department of Transportation (PennDOT) and valley residents favored a routing that took the freeway above the valley and along the side of the ridge.[19] Farther north, the widening of Skytop, the mountain cut that US 322 uses to traverse Bald Eagle Mountain, resulted in the exposure of acidic pyrite rock in 2003.[18]
Work on the segment ceased one year later[18] as PennDOT attempted to stop the flow of acidic runoff from the site. The state remedied the situation by removing 1,000,000 cubic yards (760,000 m3) of pyrite and replacing it with a mix of limestone and fill, a process that took two years and cost $83 million (equivalent to $129 million in 2023).[17] With the environmental issues settled, construction resumed on the portion of the freeway south of Skytop Mountain. The section from Bald Eagle to Port Matilda was opened to traffic on December 17, 2007,[20] while the remaining section between Port Matilda and the west end of the Mount Nittany Expressway near State College was completely opened on November 17, 2008.[18] In all, the 18-mile Bald Eagle–State College section of I-99 cost $631 million (equivalent to $893 million in 2023) to construct.[17]
I-99 was extended northeastward to meet I-80 northeast of Bellefonte following the completion of the Bald Eagle–State College segment. The connection was made by way of the preexisting Mount Nittany Expressway and another, unnamed limited-access highway connecting the State College bypass to the Bellefonte area.[17] The portion of the latter highway north of the PA 26 interchange was originally built in the 1970s as a two-lane freeway connecting Pleasant Gap to I-80. At the time, it was designated solely as PA 26.[10][11] It was widened to four lanes in 1997.[citation needed] The piece connecting the PA 26 freeway to the Mount Nittany Expressway was completed in 2002.[citation needed] US 220 was rerouted via US 322 and the new road, and the old alignment of US 220 north of US 322 was designated US 220 Alternate (US 220 Alt.) on May 30, 2003.[21] This extension, however, did not include an interchange with I-80, resulting in I-99 terminating at an at-grade intersection with Musser Lane just before reaching I-80.
Further north, one short segment of two-lane highway remained between Lawrenceville, Pennsylvania, and Presho, New York, almost entirely within New York. In the early 2010s, five miles (8.0 km) of new freeway was constructed to connect the existing freeway segments. This provided through traffic with a continuous freeway from Williamsport, Pennsylvania, to Corning, New York, and removed traffic from the overburdened two-lane section of US 15, which was retired to county route status as CR 115. On June 27, 2014, New York Governor Andrew Cuomo announced that the interstate-grade US 15 freeway from the Pennsylvania border to I-86 in Corning was officially signed as I-99.[3]
Future
Though there is no specific date for completion, long-term plans call for the two segments of I-99 to be connected via US 220 from Bellefonte to Williamsport, running concurrent with I-80 as US 220 currently does, and continue northward along US 15 from Williamsport to the New York border. The entire portion of US 15 involved has been upgraded to Interstate Highway standards in anticipation of the I-99 designation, but some sections of US 220 still require upgrades, primarily in the vicinity of both interchanges with I-80 and between Jersey Shore and Linden. Signs have been erected along the present US 220 and US 15 between Bellefonte and Corning marking the route as the "Future I-99 Corridor".[22] Some of this section of road has also received exit number designations.
PennDOT has plans to build a high-speed interchange connecting I-99 to I-80 near Bellefonte. The new interchange will eliminate local access between PA 26 (Jacksonville Road) and I-80, which will be provided by a new exit two miles (3.2 km) to the east. The first phase of the project built the local access interchange between PA 26 and I-80. Construction on the local access interchange began on July 27, 2020. The local access interchange was opened to traffic on November 10, 2022, with a ribbon-cutting ceremony held.[23][24] The local access interchange between PA 26 and I-80 was funded in part by a $35-million federal grant, with a total estimated cost of $52 million. The second phase of the project will make improvements to Jacksonville Road between the new interchange and the junction between I-80, and the third phase will build the high-speed interchange between I-80 and I-99. Bidding on the second and third phases was planned to begin in March 2022, with the improvements to Jacksonville Road to be finished by December 2023 and the high-speed interchange to be completed by December 2025.[25] However, the bids for the other phases had not been released as of May 2023.[23] As of June 2024[update], bidding began on the final phases. The second phase, the Jacksonville Road (PA 26) project is expected to take two years, cost $6.9 million and completion is now scheduled for the middle of 2026. Completion of the third and final phase, the $246 million high-speed interchange, is now expected in 2030.[26]
During a 2002 taskforce meeting for I-99, it was suggested that I-390, which extends north from I-86 24 miles (39 km) west of the I-86/I-99 junction near Corning and which crosses I-90 and terminates in the greater Rochester metropolitan area, be redesignated as I-99 once the I-80 to I-86 portion of that route is completed. The idea posits that I-390 is a logical extension of the I-99 corridor because I-99's predecessor, US 15, originally extended to Rochester. No official moves to accomplish this have been taken.[citation needed]
Exit list
State | County | Location | mi[27][28] | km | Exit | Destinations | Notes | |
---|---|---|---|---|---|---|---|---|
Pennsylvania | Bedford | Bedford Township | 0.000 | 0.000 | US 220 south to US 30 – Cumberland | Southern end of US 220 concurrency; continuation south | ||
1 | To I-70 / I-76 / Penna Turnpike – Pittsburgh, Harrisburg | Access via US 220 Bus. | ||||||
2.892 | 4.654 | 3 | PA 56 (US 220 Bus. south) – Johnstown, Cessna | |||||
East St. Clair Township | 6.597 | 10.617 | 7 | PA 869 – St. Clairsville, Osterburg | ||||
King Township | 10.112 | 16.274 | 10 | Blue Knob State Park | Access via Sarah Furnace Road | |||
Blair | Greenfield Township | 14.900 | 23.979 | 15 | Claysburg, King | Access via US 220 Bus. | ||
Freedom Township | 22.798 | 36.690 | 23 | PA 36 / PA 164 to US 22 east – Roaring Spring, Portage, Hollidaysburg | ||||
Allegheny Township | 28.045 | 45.134 | 28 | US 22 – Ebensburg, Hollidaysburg | ||||
Logan Township | 30.507 | 49.096 | 31 | Plank Road (US 220 Bus.) | Access to Logan Valley Mall | |||
31.803 | 51.182 | 32 | Frankstown Road to PA 36 | Access to Lakemont Park and Peoples Natural Gas Field | ||||
32.921 | 52.981 | 33 | 17th Street | Access to Logan Town Centre | ||||
Antis Township | 38.521 | 61.994 | 39 | PA 764 south – Pinecroft | Northern terminus of PA 764 | |||
41.193 | 66.294 | 41 | PA 865 north – Bellwood | Southern terminus of PA 865 | ||||
45.004 | 72.427 | 45 | Tipton, Grazierville | Access via Pleasant Valley Boulevard; access to DelGrosso's Amusement Park | ||||
Tyrone | 47.529 | 76.491 | 48 | PA 453 – Tyrone | To PA 550 and Huntingdon | |||
Snyder Township | 51.592 | 83.029 | 52 | PA 350 (US 220 Bus. south) – Bald Eagle, Philipsburg | ||||
Centre | Worth Township | 61.437 | 98.873 | 61 | Port Matilda | Access via US 220 Alt. | ||
62.243 | 100.170 | 62 | US 322 west – Philipsburg | Southern end of US 322 concurrency; southbound exit and northbound entrance | ||||
Patton Township | 68.993 | 111.033 | 68 | Grays Woods, Waddle | Access via Grays Woods Boulevard/Atherton Street | |||
69.706– 70.200 | 112.181– 112.976 | 69 | US 322 Bus. east (Atherton Street) / Valley Vista Drive – Park Forest | Signed for US 322 Bus./Atherton northbound, Valley Vista/Park Forest southbound; western terminus of US 322 Bus. | ||||
71.122 | 114.460 | 71 | Toftrees, Woodycrest | Access via Waddle Road | ||||
College Township | 73.944 | 119.001 | 73 | US 322 east – State College, Lewistown | Northern end of US 322 concurrency | |||
75.067 | 120.809 | 74 | Innovation Park, Penn State University | Access via Park Avenue; access to Beaver Stadium and Bryce Jordan Center | ||||
Benner Township | 76.484 | 123.089 | 76 | Shiloh Road | ||||
78.991 | 127.124 | 78 | PA 150 – Bellefonte | Signed as exits 78A (south) and 78B (north) | ||||
Spring Township | 81.232 | 130.730 | 80 | Harrison Road | Northbound exit and southbound entrance | |||
81.728 | 131.528 | 81 | PA 26 south to PA 64 – Pleasant Gap | Southern end of PA 26 concurrency | ||||
83.605 | 134.549 | 83 | PA 550 – Bellefonte, Zion | |||||
85.780 | 138.050 | US 220 north / PA 26 north to I-80 | Northern end of US 220/PA 26 concurrency; continuation north | |||||
Gap in designation, connection made via I-80 and US 220 | ||||||||
Lycoming | Williamsport | 131.67 | 211.90 | 29 | I-180 east / US 220 north / US 15 south – Montoursville, Lewisburg | North end of U.S. 220 concurrency; current southern terminus of I-99 northern segment; western terminus of I-180 | ||
132.09 | 212.58 | 136 | Third Street | Northbound exit and entrance | ||||
132.37 | 213.03 | 136 | Fourth Street | Southbound exit and entrance | ||||
Old Lycoming Township | 132.99 | 214.03 | 137 | Foy Avenue / High Street / Lycoming Creek Road | ||||
Lycoming Township | 136.34 | 219.42 | 140 | Hepburnville | ||||
138.90 | 223.54 | 143 | PA 973 – Perryville, Cogan Station | Southbound exit only | ||||
Lewis Township | 144.00 | 231.75 | 148 | PA 14 north – Trout Run, Canton | Southern terminus of PA 14 | |||
Cogan House Township | 148.27 | 238.62 | 152 | Cogan House (Green Mountain Road)[29][30] | Southbound exit and entrance. Connected to Steam Valley Road via State Route 4011 | |||
148.89 | 239.62 | 152 | Cogan House (Steam Valley Road)[29][30] | Northbound exit and entrance; access via State Route 4011 | ||||
150.90 | 242.85 | 155 | PA 184 west – Steam Valley[29][30] | Eastern terminus of PA 184 | ||||
Jackson Township | 153.68 | 247.32 | 158 | PA 284 west – Buttonwood, English Center | Eastern terminus of PA 284 | |||
Tioga | Liberty | 158.81 | 255.58 | 162 | PA 414 – Liberty, Morris | |||
160.96 | 259.04 | 165 | Sebring | |||||
Blossburg | 168.08 | 270.50 | 172 | Blossburg | ||||
Richmond Township | 175.55 | 282.52 | 179 | US 15 Bus. north / PA 660 west – Canoe Camp, Covington | Southern terminus of US 15 Bus.; eastern terminus of PA 660 | |||
Mansfield | 177.82 | 286.17 | 182 | US 6 – Mansfield, Wellsboro | Access to Hills Creek State Park and Mansfield University | |||
Richmond Township | 179.16 | 288.33 | 183 | US 15 Bus. south (Main Street) | Southbound exit, northbound entrance; northern terminus of US 15 Bus. | |||
Tioga Township | 187.65 | 301.99 | 191 | PA 287 – Tioga, Tioga Junction | ||||
Lawrence Township | 192.46 | 309.73 | 196 | PA 49 – Elkland, Lawrenceville | Access to Cowanesque Lake | |||
194.89 0.00 | 313.65 0.00 | Pennsylvania–New York state line | ||||||
New York | Steuben | Lindley | 6.36 | 10.24 | 6 | CR 5 – Presho | ||
Erwin | 8.16 | 13.13 | 8 | NY 417 – Erwin, Addison | ||||
11.12 | 17.90 | 11 | NY 417 – Gang Mills | |||||
11.69 | 18.81 | 12 | Robert Dann Drive (CR 107) | No northbound exit | ||||
12.10 | 19.47 | I-86 west / NY 17 west (Southern Tier Expressway) – Jamestown, Rochester | Northbound exit and southbound entrance; exit 44 on I-86 | |||||
13B | NY 352 east / NY 415 – Riverside, Downtown Corning | Northbound exit only; NY 415 not signed; western terminus of NY 352 | ||||||
12.68 | 20.41 | 13A | I-86 east / NY 17 east (Southern Tier Expressway) – Binghamton, Corning US 15 south | Northern end of US 15 concurrency; northern terminus | ||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
References
- ^ a b c Starks, Edward (January 27, 2022). "Table 1: Main Routes of the Dwight D. Eisenhower National System of Interstate and Defense Highways". FHWA Route Log and Finder List. Federal Highway Administration. Retrieved January 21, 2023.
- ^ a b "Report of the Special Committee on U.S. Route Numbering to the Standing Committee on Highways" (PDF). American Association of State Highway and Transportation Officials. November 7, 1998. Archived from the original (PDF) on October 12, 2006. Retrieved July 18, 2010.
- ^ a b [Staff writer] (June 28, 2014). "Corning Area Now Has 2 Interstates: US 15 Designated I-99 to Pa. Border". Star-Gazette. Archived from the original on July 15, 2014. Retrieved June 28, 2014.
- ^ Special Committee on U.S. Route Numbering (October 30, 2024). "2024 Annual Meeting Report to the Council on Highways and Streets" (Report). Washington, DC: American Association of State Highway and Transportation Officials. Retrieved November 12, 2024 – via AASHTO Route Numbering Archive.
- ^ a b c d "Overview Map of I-99" (Map). Google Maps. Retrieved July 18, 2010.
- ^ a b Microsoft; Nokia. "overview map of Interstate 99 in New York" (Map). Bing Maps. Microsoft. Retrieved July 24, 2012.
- ^ Yanosey, Robert J. (2006). New York. Erie Railroad Facilities in Color. Vol. 2: NY. Lawton, Devon (photographer). Scotch Plains, New Jersey: Morning Sun Books. p. 71. ISBN 1-58248-196-2.
- ^ "Status of the Appalachian Development Highway System as of September 30, 2009" (PDF). Appalachian Regional Commission. December 2009. Archived from the original (PDF) on October 5, 2010. Retrieved July 18, 2010.
- ^ Pennsylvania (Map) (1964–65 ed.). Cartography by H. M. Gousha Company. Sun Oil Company. 1964.
- ^ a b c Official Map of Pennsylvania (PDF) (Map). Pennsylvania Department of Highways. 1970. Retrieved July 18, 2010.[permanent dead link ]
- ^ a b c Commonwealth of Pennsylvania Official Transportation Map (PDF) (Map). Pennsylvania Department of Transportation. 1980. Retrieved July 18, 2010.[permanent dead link ]
- ^ Pennsylvania Official Transportation Map (PDF) (Map). Pennsylvania Department of Transportation. 1989. Retrieved July 18, 2010.[permanent dead link ]
- ^ Easy-to-Read Travel Atlas: United States–Canada–Mexico (Map). Rand McNally and Company. 1997. p. 44. ISBN 0-528-81575-X.
- ^ "Bill Summary & Status H.R.2950". Archived from the original on December 15, 2012. Retrieved June 23, 2014.
- ^ "Bill Text H.R.2950". Retrieved June 23, 2014.[permanent dead link ]
- ^ "National Highway System Designation Act of 1995". Retrieved June 23, 2014.
- ^ a b c d Hamill, Sean D. (December 27, 2008). "Road Stirs Up Debate, Even on Its Name". The New York Times.
- ^ a b c d Bock, Greg (November 25, 2008). "Long road for I-99 comes to end". Altoona Mirror. Retrieved July 18, 2010.
- ^ Gibb, Tom (December 7, 2002). "I-99 segment gets environmental OK". Pittsburgh Post-Gazette. Retrieved July 19, 2010.
- ^ Bock, Greg (December 18, 2007). "Long-awaited I-99 stretch opens". Altoona Mirror. Retrieved July 19, 2010.
- ^ "Report of the Special Committee on U.S. Route Numbering to the Standing Committee on Highways" (PDF). American Association of State Highway and Transportation Officials. May 31, 2003. Archived from the original (PDF) on February 4, 2007. Retrieved July 18, 2010.
- ^ "US 15/Future I-99 Multiplex - Central PA/MD Roads". www.m-plex.com. Retrieved January 13, 2019.
- ^ a b Sinderson, Gary (November 10, 2022). "First phase of Interstate 99/I-80 interchange project complete". WJAC. Retrieved May 5, 2023.
- ^ Kines, Halie (November 11, 2022). "After a 'long road,' the first phase of the Jacksonville Road project is open in Centre County". Centre Daily Times. Retrieved November 15, 2022.
- ^ "PennDOT Details New Local Access Tied to I-80/I-99 Interchange Project". Centre County Gazette. March 1, 2019. Archived from the original on March 1, 2019. Retrieved March 2, 2019.
- ^ "Next Phases of I-80/I-99 High Speed Interchange Project to Begin This Year". StateCollege.com. April 18, 2024. Retrieved June 5, 2024.
- ^ Bureau of Maintenance and Operations (January 2015). Roadway Management System Straight Line Diagrams (Report) (2015 ed.). Pennsylvania Department of Transportation. Retrieved June 30, 2015.[permanent dead link ]
- Bedford County[permanent dead link ] (PDF)
- Blair County[permanent dead link ] (PDF)
- Centre County[permanent dead link ] (PDF)
- ^ "Steuben County Inventory Listing". New York State Department of Transportation. October 1, 2009. Archived from the original (CSV) on April 8, 2013. Retrieved January 17, 2010.
- ^ a b c Kitsko, Jeffrey J. (2011). "U.S. Route 15". Pennsylvania Highways. Retrieved February 25, 2013.[unreliable source]
- ^ a b c "Route 15 southbound lanes opened". The Wellsboro Gazette. November 18, 2009. Retrieved February 25, 2013.
External links
- Interstate Guide – I-99
- I-99 in Pennsylvania at AARoads.com
- I-99/US 15 in New York at AARoads.com
- Pennsylvania Highways: Interstate 99 Archived September 24, 2015, at the Wayback Machine
- Interstate 99 at New York Routes
- Pennsylvania Roads - I-99
- Interstate Highway System
- Interstate Highways in Pennsylvania
- Interstate Highways in New York (state)
- Bald Eagle Valley
- Nittany Valley
- Transportation in Bedford County, Pennsylvania
- Transportation in Blair County, Pennsylvania
- Transportation in Centre County, Pennsylvania
- Transportation in Steuben County, New York