Jump to content

英文维基 | 中文维基 | 日文维基 | 草榴社区

Chiba Thermal Power Station

Coordinates: 35°33′53″N 140°06′19″E / 35.56477°N 140.1053°E / 35.56477; 140.1053
From Wikipedia, the free encyclopedia
(Redirected from Chiba Power Station)
Chiba Thermal Power Station
Map
CountryJapan
LocationChiba Bay, Chuo-ku, Chiba, Japan
Coordinates35°33′53″N 140°06′19″E / 35.56477°N 140.1053°E / 35.56477; 140.1053
StatusOperational
Commission dateGroup 1 & 2 - 2000
Group 3 - 2014
Construction cost340+ billion Yen
OwnerJERA
Operator
Thermal power station
Primary fuelLiquefied natural gas
Site area~0.76 million m²
Combined cycle?CCGT
IWPP water outputInto Sea
Power generation
Units operational8 x 360MW + 3 x 500MW
Nameplate capacity4380 MW
External links
WebsiteChiba Thermal Power Station

Chiba Thermal Power Station, is an operational thermal power station located in Japan, run by JERA, with a maximum output of 4380 MW. Originally built in the late 1950s as a coal-burning plant, it was later converted to a plant burning liquefied natural gas in the year 2000.[1][2]

History

[edit]

Chiba Thermal Power Station started operation in the late 1950s as a 600MW capacity coal fired power plant. It had four units, but due to the aging of the facilities and the increasing demand for electricity, in 2000 it was eventually renovated to a combined cycle power plant and fuelled with Liquefied Natural Gas (LNG). Groups 1 & 2 were constructed and this increased the power station to a maximum output of 2880 MW. In 2011, as part of an emergency plan to supply power after the Great East Japan Earthquake, three gas turbine systems were constructed within 4 months. From 2012 to 2014, a more advanced combined cycle system was added as group 3. This had a total output of 1500MW.[2]

Power generation

[edit]
Operation Started Power Generation Type Design Thermal Efficiency Output Total Output
Group 1 April 2000 ACC 54.2% 360MW x 4 1440MW
Group 2 June 2000 ACC 54.2% 360MW x 4 1440MW
Group 3 July 2014 MACC Units 3-1 & 3-2 = 57.3
Unit 3-3 = 57.7
500MW x 3 1500MW

When Chiba Thermal Power Station was renovated to a combined cycle power plant, Groups 1 & 2 were constructed. Each has a total power output of 1440 MW. Group 3 was constructed outdoors, as opposed to indoors like Groups 1 & 2, as it needed to be built as quickly as possible after the Great East Japan Earthquake. Group 3 has a power output of 1500MW. The total power output of the station is 4380MW and the site covers approximately 760,000 square metres of land.[2][3] The fuel used — LNG — is supplied by pipeline from terminals located at Sodegaura Power Station and Futtsu Power Station and it outputs its water into the nearby sea.[4][5]

Historic power generation

[edit]
Operation Started Operation Ended Fuel Design Thermal Efficiency Total Output
Group 1 (old) April 1957 March 1999 Coal, later Crude Oil 37.2% 125MW
Group 2 (old) November 1957 March 1999 Coal, later Crude Oil 37.2% 125MW
Group 3 (old) January 1959 March 1999 Coal, later Crude Oil 38.8% 175MW
Group 4 (old) November 1959 March 1999 Coal, later Crude Oil 38.8% 175MW

Group 1 of the initial power station was started in April 1957, and later, more groups were added up to Group 4 in November 1959. Originally, the power station burnt coal, but subsequently switched to crude oil. However, as these facilities were beginning to age, and the demand for electricity was increasing, in 2000, the facilities were renovated and a new combined cycle power generation system was installed.[2]

See also

[edit]

References

[edit]
  1. ^ "Chiba Thermal Power Station". Jera. Retrieved 2020-03-01.
  2. ^ a b c d "Chiba Thermal Power Station" (PDF). Jera. Retrieved 2020-03-01.
  3. ^ "www7.tepco.co.jp". Archived from the original on 2020-02-29. Retrieved 2020-03-01.
  4. ^ "Overview of Chiba Thermal Power Station" (PDF). Tepco. Retrieved 2020-03-01.
  5. ^ "プレスリリース 2000年". Tepco (in Japanese). Retrieved 2020-03-01.