Ernakulam–Kayamkulam coastal line

From Wikipedia, the free encyclopedia

Ernakulam metropolitan –Kayamkulam city Coastal line
Cherthala railway station on Ernakulam–Kayamkulam line
Overview
Native nameഎറണാകുളം നഗരം-കായംകുളം പട്ടണം തീരദേശ തീവണ്ടി പാത
StatusOperational
OwnerIndian Railways
LocaleKerala
Termini
Stations20
Websitewww.sr.indianrailways.gov.in
Service
TypeRegional rail
Light rail
Services1
Operator(s)Southern Railway zone
History
Opened16 October 1989; 35 years ago (1989-10-16)
Technical
Line length102 km (63 mi)
Number of tracks1
Track gauge1,676 mm (5 ft 6 in)
Loading gauge4,725 mm × 3,660 mm (15 ft 6.0 in × 12 ft 0.1 in) (BG)
Operating speed110 km/h (68 mph)
Route map

Ernakulam–Kayamkulam coastal line is a railway line which runs along the coastal areas of Alappuzha, Ernakulam districts in Kerala state of India. The coastal railway line starts as a branch line from Ernakulam Junction railway station towards Alappuzha and joins with the route via Kottayam ( Ernakulam-Kottayam-Kayamkulam line) at Kayamkulam Junction. This is the only main track in Kerala yet to be doubled and the single line traffic causes major delays in the route. The coastal line has a total distance of 102 km (63 mi).

History

[edit]

The initial survey for the Ernakulam–Kayamkulam line via Alappuzha was started in 1975. The initial proposed alignment of the railway line from Ernakulam Junction to Alappuzha has been changed after protests from various quarters. This line was mentioned in 1977-78 final budget.[1] The final alignment of the route which was approved was Ernakulam–Konthuruty–Nettor–KumbalamAroorCherthala–Alappuzha. The construction of railway line was started on 15 April 1979 and the construction has been divided into two reaches as Ernakulam–Alappuzha reach and Alappuzha–Kayamkulam reach.[2]

Ernakulam–Alappuzha section

[edit]

The construction of this coastal railway line in Ernakulam JunctionAlappuzha railway station section was started in 1979. Construction of Alleppey-Ernakulam new B.G. Railway line has been included in the budget for 1979-80, with a proposed outlay, of Rs. 1 crore in the coming financial year 1979-80.[3] Around 140 hectares of land was acquired for laying the railway lines. 11 new railway stations and 6 major bridges have been constructed along this route. The Aroor Bridge is the Longest Bridge in this section having length of 1,849 m (6,066 ft) The total cost outlay was 7 crores and the total length of the railway line is 58 km (36 mi). The line was opened to railway traffic on 16 October 1989.

Alappuzha–Kayamkulam section

[edit]

The construction of Alappuzha–Kayamkulam section was started as part of second phase of coastal railway development and the alignment was via AlappuzhaPunnapraAmbalappuzhaHaripadKayamkulam. The total length of the railway line was 44 km (27 mi) and the line was opened to railway traffic on 1992. Thus, the Ernakulam JunctionAlappuzha coastal railway line has been connected to Kayamkulam Junction railway stationKollam Junction main railway line.

Stations

[edit]

There are 18 stations along this route. Alappuzha, Cherthala, Haripad, and Ambalappuzha stations are the major stations along this route.

Electrification and track doubling

[edit]

Ernakulam JunctionAlappuzhaKayamkulam railway line is fully electrified. The double line work on 14 km (8.7 mi) Kayamkulam–Haripad section has been completed and the double line track was commissioned in January 2012. The track doubling work for Haripad– Ambalapuzha was also commissioned. Hence there is a double line from Kayamkulam to Ambalapuzha with a track length of 31 km. Doubling of the 1,849 m (6,066 ft) Long Aroor Bridge has started in 2019, but no sign of doubling as of September 2024.

The doubling works for the Ambalapuzha- Ernakulam junction sector is painfully slow. However, as of June 2021, The Railways has sanctioned an additional Rs 510 crore for acquiring land for the doubling of the line from Ernakulam to Thuravoor.[4] This money bas been kept in the Collectorates of Ernakulam and Alappuzha districts without any further action.

No doubling works are initiated in this stretch as of September 2023. Railways are trying to complete the Ernakulam Junction - Kumbalam (7.71 km) stretch of the route in the first phase followed by Kumbalam - Thuravoor (15.59 km) and Thuravoor - Ambalapuzha (50 km) stretches in the second and third phases respectively. Ernakulam - Kumbalam stretch has the most number of bridges. The new estimate is as follows:

Ernakulam to Kumbalam : 600.82 crores.

Kumbalam to Thuravoor : 825.37 crores.

Thuravoor to Ambalapuzha : 1281 crores.

Rail traffic

[edit]

The Ernakulam–Alappuzha–Kayamkulam coastal line has 20 express trains and 7 passenger trains running along this route.

There is also freight traffic through this line.

Needed development

[edit]
  • A bypass line connecting Cochin Harbour Terminus railway station line with Alappuzha line near Kochu Kadavanthra and Thevara. It will help decongest Ernakulam Junction railway station and help start more south bound trains via Alappuzha. Also CHTS has been reopened to do the same.
  • Timely completion of doubling of line and improvement of signalling in a manner such that headway will be minimum. This will help start Kollam - Alappuzha - Kochi suburban trains. This will lead to a circular rail for Kochi.
  • Building a connection between Aroor Halt and Kanjiramattom on Ernakulam–Kottayam–Kayamkulam line so that a circular suburban rail network can be developed around Kochi. And decongest Ernakulam yard.
  • This line is devoid of any high degree curves and hence is suitable for upgradation of permissible speeds upto 130kmph. Currently the two fastest trains in the state namely Jan Shatabdi Express and Rajdhani Express passes through this line with speeds above 90 kmph at certain reaches.[5]
  • Replacement of major level crosses in the section with flyovers. Especially on Haripad - Mavelikkara, Ambalapuzha - Thiruvalla, Cherthala - Arthunkal, Haripad - Edathua roads and at Atlantis Junction of Kochi.
  • Development of infrastructure, amenities and last mile connectivity to stations along the line.
  • Development of Alappuzha pitline so that the existing pitline can be able to do primary maintenance for trains so that new trains can be operated. As of now, only secondary maintenance can be done there due to the lack of Coaching and Wagon Depot.

See also

[edit]

References

[edit]
  1. ^ "Railway Budget speech 1977-78 (final)" (PDF). www.indianrailways.gov.in. Government of India, Ministry of Railways. 11 June 1977.
  2. ^ E Sreedharan-Autobiography DC Books, 2014, pages 47-51
  3. ^ https://eparlib.nic.in/bitstream/123456789/2057/1/lsd_06_07_01-03-1979.pdf Page no. 26
  4. ^ "Kerala rail projects: Rs 985 cr more allowed for land acquisition".
  5. ^ "Railways initiates measures to upgrade train speed in Kerala". www.onmanorama.com. Retrieved 6 November 2022.