Jump to content

英文维基 | 中文维基 | 日文维基 | 草榴社区

Interstate 87 (North Carolina)

Route map:
From Wikipedia, the free encyclopedia
(Redirected from I-44 (VA))

Interstate 87 marker
Interstate 87
Map
I-87 highlighted in red; Future I-87 highlighted in blue
Route information
Maintained by NCDOT
Length12.90 mi[1] (20.76 km)
Existed2017–present
NHSEntire route
Major junctions
South end I-40 / I-440 / US 64 in Raleigh
Major intersections
North end US 64 / US 264 / Rolesville Road in Wendell
Location
CountryUnited States
StatesNorth Carolina
CountiesNC: Wake
Highway system
NC 86NC NC 87

Interstate 87 (I-87) is a partially completed Interstate Highway in the US state of North Carolina, the shortest designated primary Interstate Highway at 12.90 miles (20.76 km) long. The completed portion is in eastern Wake County, between Raleigh and Wendell; the majority of the completed route (approximately 10 miles (16 km)) is known as the Knightdale Bypass, while the remaining three miles (4.8 km) follows the Raleigh Beltline (I-440). It is planned to continue northeast through Rocky Mount, Williamston, and Elizabeth City, ending in Norfolk, Virginia.[2] It is signed as north–south, in keeping with the sign convention for most odd-numbered interstates, but the route goes primarily east–west, with the eastern direction aligning to the north designation. The entire route is concurrent with U.S Highway 64 (US 64), with portions also concurrent with I-440 and US 264.

Route description

[edit]

I-87 is a six-lane Interstate Highway that connects I-40, in Raleigh, to Rolesville Road, in Wendell; it is entirely concurrent with US 64. The speed limit for majority of the route is 70 mph (110 km/h).

The southern terminus is at the interchange of I-40 and I-440 (Raleigh Beltline) in Southeast Raleigh, at I-40 exit 301/I-440 exit 16. I-87 north follows I-440 west for approximately three miles (4.8 km) before exiting the Beltline at exit 14 to follow the US 64/US 264 (former I-495) freeway, known locally as the Knightdale Bypass. Following the Bypass south of Knightdale, I-87 has interchanges with two local roads (New Hope Road and Hodge Road) before meeting the eastern terminus of I-540. Two more local roads follow (Smithfield Road and Wendell Falls Parkway) before the I-87 designation ends at a complex interchange with US 64 Business (US 64 Bus.)/Knightdale Boulevard/Wendell Boulevard and Rolesville Road.

A portion of this freeway (from I-440 to I-540) was formerly designated I-495 from 2013 to 2017. I-495 signs were removed, and mileage markers and exit numbers were changed to reflect the redesignation in May 2019.[2][3]

Beyond Rolesville Road, the US 64 freeway from Wendell to Williamston is designated as Future I-87. It does not meet interstate highway standards and will need wider travel lanes, wider shoulders and Jersey barriers added in the grass median. The remainder to the Virginia border is not built as a limited access freeway and will require expansion parallel to existing US Highways, including US 13, US 17, and US 158.

History

[edit]

Interstate 495

[edit]
Interstate 495 marker
Interstate 495
LocationRaleighKnightdale
Length4.09 mi[4][5] (6.58 km)
Existed2013–2017

A portion of I-87, originally designated I-495, was first designated as an Interstate Highway on February 20, 2013, when the North Carolina Department of Transportation (NCDOT) submitted a request to the American Association of State Highway and Transportation Officials (AASHTO) in order to establish I-495 as a new auxiliary route of I-95. The proposed 44.99-mile (72.40 km) route would begin at I-440/US 64/US 64 Bus. in Raleigh and would end at I-95, in Rocky Mount, completely concurrent with US 64.[6]

On March 15, 2013, AASHTO received a modified request from NCDOT requesting the establishment of I-495 from I-440 to I-540 (4.09 mi or 6.58 km) and Future I-495 from I-540 to I-95 (40.90 mi or 65.82 km). It was approved, though needed an additional approval from the Federal Highway Administration (FHWA).[5] On December 12, 2013, the proposed section was approved by the FHWA and was added to the interstate highway system.[7]

The freeway section, the part that was originally to be signed I-495 and continuing east to US 64 Bus., was completed in 2006. From I-440 to Rolesville Road, the freeway was built to Interstate standards, which is why the first official section of I-495 was able to connect between I-440 and I-540.[8] East of Rolesville Road, the freeway was built in sections, since 1975. This older section of freeway will eventually be expanded to Interstate standards, which include road rehabilitation and wider lanes and shoulders.

Renumbering

[edit]
"Future I-495" sign along US 64/US 264 near Knightdale. Signs like this were later replaced by "Future I-87" signs.
Northern terminus of I-495, in Knightdale
Southern terminus of I-495/US 264 in Raleigh

Long-term plans by the Raleigh–Durham area's Regional Transportation Alliance (RTA) called for extension of the interstate east of I-95 toward Elizabeth City, then northeastward to the I-64/I-464 interchange in Hampton Roads. NCDOT proposed the Interstate 44 designation for the Raleigh–Norfolk High Priority Corridor consisting of portions of the I-495 and US 64 in North Carolina and US 17 in North Carolina and Virginia. The route would connect two of the largest US metropolitan areas lacking an Interstate connection: the Research Triangle area around Raleigh and the Hampton Roads area around Norfolk.[9][10]

NCDOT requested the addition of the corridor to the Interstate Highway System as I-44 in November 2012.[11] Representative G. K. Butterfield introduced legislation in June 2014 to add the corridor to the Interstate Highway System through Congressional authority.[12] An NCDOT policy paper said they were "seeking language in the reauthorization of surface transportation programs legislation to enhance the description of the Raleigh–Norfolk Corridor to include the route via Rocky MountElizabeth City for clarity, and to designate the entire route from Raleigh to Norfolk as a future part of the Interstate system as I-44 or I-50".[9][10] Had the I-44 designation been approved, it would have been discontinuous with the current I-44, which runs between Wichita Falls, Texas, and St. Louis, Missouri.

The proposed corridor was officially designated as a future interstate with the passage of the Fixing America's Surface Transportation Act (FAST Act) on December 14, 2015.[13] Soon, several other route numbers were discussed and the RTA set their preference on two more-likely candidates: I-56 if an east–west designation were chosen or I-89 if a north–south designation were chosen.[14] I-56 is not in use, while I-89 exists in Vermont and New Hampshire, far north of this corridor.[14] For the upcoming AASHTO Special Committee on US Route Numbering, NCDOT proposed I-89 for this route.[15] On May 25, 2016, AASHTO instead approved I-87 as the number for the highway.[15][16] The new I-87 would be noncontiguous with the route with the same number in New York.[17] The I-87 designation pays tribute to several important dates in the history of both North Carolina and Virginia: the Roanoke Colony was founded in 1587, James Madison's Virginia Plan helped to develop the US Constitution in 1787, and North Carolina State University was created in 1887.[18]

On May 23, 2017, AASHTO approved the request by NCDOT to decommission existing I-495 and Future I-495; they were replaced by I-87 and Future I-87.[19] I-87 signage were installed on September 5, 2017; in May 2019 milemarkers and exit numbers were changed along the already completed segment from the I-440 junction to Rolesville Road. Exit numbers and mileage along the portion coincident with I-440 will retain I-440 mileage and exit numbers.[2][3] I-87 will continue east along US 64 to I-95 after the road is expanded to Interstate standards.[5][7]

Future

[edit]

I-87 will extend from its current terminus at Rolesville Road to an undetermined location in Norfolk, Virginia. Existing plans have the Interstate running east along US 64 to Williamston. This section of US 64 is built as a freeway but will need to be improved to Interstate Highway standards. In Williamston, the Interstate is planned to leave US 64 and begin following an alignment along present-day US 17.

A feasibility study for the section between Williamston and the Virginia state line was completed in 2018. NCDOT maps show the Interstate roughly following the US 17 corridor between Williamston and South Mills. There are several areas where the Interstate may deviate from the current routing of US 17 and be placed on a new freeway. Some of these expansions are part of the NCDOT 10-year plan released in 2017, with expansion of highways around Elizabeth City given a start date of 2023.[20][needs update]

To the north of South Mills, NCDOT has laid out two plans on how the Interstate would proceed to Virginia. One plan shows I-87 running north along US 17 to the Virginia state line. In contrast, a second plan shows an interchange with I-87 and US 17 just north of modern-day McPherson Road and the Dismal Swamp Welcome Center. I-87 would then proceed to the east along new routing to North Carolina Highway 168 (NC 168)/State Route 168 (SR 168). The interchange with Route 168 would take place just north of the North Carolina–Virginia state line. This alternate alignment was in response to VDOT expressing concern that I-87 would be seen as a non-toll alternative to SR 168 if the former were constructed along the US 17 corridor. Currently, US 17 is a four-lane expressway between the North Carolina state line and Norfolk, Virginia. SR 168 is also a four-lane expressway for approximately 1.8 miles (2.9 km)[21] between the state line and Battlefield Boulevard (SR 168 Bus.), but then transitions to a four-lane tolled limited access freeway known as the Chesapeake Expressway north of that intersection. If NCDOT were to choose this alternative alignment as the preferred route, I-87 would presumably follow SR 168 to Norfolk. NCDOT estimates that the section between Williamston and the Virginia state line could cost between $849.7 million and $945.2 million.[22]

As of February 5, 2024, Virginia does not have a timetable to complete their section of I-87 and is not part of their infrastructure budget.[23][24]

Exit list

[edit]

Exit numbers were signed in May 2019. The entire route is in Wake County.

Locationmi[25]kmOld exitNew exitDestinationsNotes
Raleigh0.00.0

I-40 west / US 64 west – Durham
Continuation as I-40 / US 64
16
I-40 east – Wilmington, Benson

I-440 east
Western end of I-440 concurrency; mile markers and exit number based on I-440 mileage
1.93.115Poole RoadMile markers and exit number based on I-440 mileage
2.94.74193
I-440 west

US 264 east – Wake Forest
Eastern end of I-440 concurrency; western end of US 264 concurrency; west/north direction signed as exit 14
3.55.64204New Hope Road
Knightdale5.79.24226Hodge Road
6.710.84237
I-540 west – Wake Forest, RDU Airport
Will be extended as Toll NC 540
9.014.54259Smithfield Road
Wendell10.717.242711Wendell Falls Parkway
12.520.142913
US 64 Bus. (Wendell Boulevard/Knightdale Boulevard) – Knightdale
For southbound entrance onto US 64 Bus. east and northbound entrance from US 64 Bus. west, use Rolesville Road
12.920.843014Rolesville Road – RolesvilleSouthbound exit and northbound entrance


US 64 east / US 264 east – Rocky Mount, Wilson
Continuation as US 64 / US 264
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Auxiliary routes

[edit]

I-87 in North Carolina has one spur route, I-587 to Greenville. However, the westernmost segment of I-587 that would connect with I-87 near Wendell is still marked as US 264 (and Future I-587) until it is upgraded to current Interstate Highway standards.[citation needed]

See also

[edit]

References

[edit]
  1. ^ Starks, Edward (January 27, 2022). "Table 1: Main Routes of the Dwight D. Eisenhower National System of Interstate and Defense Highways". FHWA Route Log and Finder List. Federal Highway Administration. Retrieved September 3, 2022.
  2. ^ a b c Stradling, Richard (September 6, 2017). "Have you driven on I-87 yet?". The News & Observer. Raleigh, NC. Retrieved September 6, 2017.
  3. ^ a b "Changes in Exit Numbers for I-87 Start Next Week" (Press release). Raleigh, NC: NCDOT. May 10, 2019. Retrieved May 10, 2019.
  4. ^ "Interstate 495" (Map). Google Maps. Retrieved December 14, 2013.
  5. ^ a b c Lacy, J. Kevin (March 27, 2013). "An Application from the State Highway or Transportation Department of North Carolina" (PDF). Letter to Frederick G. Wright. Raleigh: North Carolina Department of Transportation. Archived from the original (PDF) on October 19, 2013. Retrieved December 14, 2013 – via American Association of State Highway and Transportation Officials.
  6. ^ North Carolina Department of Transportation (December 14, 2013). I-495 Route Change (2013-02-20) (PDF) (Map). c. 1:422,400. North Carolina Department of Transportation. Retrieved February 28, 2013.
  7. ^ a b North Carolina Department of Transportation (December 14, 2013). "North Carolina Gets a New Interstate, with the I-495 Designation near Raleigh" (Press release). North Carolina Department of Transportation. Archived from the original on July 5, 2017. Retrieved December 12, 2013.
  8. ^ North Carolina Department of Transportation (November 8, 2006). "US 64 Route Change (2006-11-08)" (PDF). North Carolina Department of Transportation. Retrieved December 14, 2013.
  9. ^ a b North Carolina Department of Transportation (June 11, 2014). "Future Interstate Designation: Raleigh, NC to Norfolk, VA" (PDF). North Carolina Department of Transportation. Archived from the original (PDF) on September 5, 2014. Retrieved September 4, 2014 – via Regional Transportation Alliance.
  10. ^ a b "Interstate 495 to Rocky Mount—Future I-44 to Hampton Roads". Raleigh, NC: Regional Transportation Alliance. December 14, 2013. Archived from the original on May 5, 2014. Retrieved February 16, 2014.
  11. ^ Gibson, Terry R. (November 27, 2012). "Archived copy" (PDF). Letter to John F. Sullivan III. Raleigh: North Carolina Department of Transportation. Archived from the original (PDF) on May 17, 2014. Retrieved May 15, 2014.{{cite press release}}: CS1 maint: archived copy as title (link)
  12. ^ Tata, Anthony J. (June 11, 2014). "Route to Opportunity and Development Act (ROAD Act)" (PDF). Letter to G.K. Butterfield. North Carolina Department of Transportation. Archived from the original (PDF) on September 4, 2014. Retrieved September 4, 2014.
  13. ^ "H. R. 22—111" (PDF). Retrieved March 31, 2016.
  14. ^ a b Milazzo, Joe II (December 31, 2015). "Raleigh-Norfolk: I-495, I-44, I-50, I-89, I-56 ... ?". Raleigh, NC: Regional Transportation Alliance. Archived from the original on February 13, 2016. Retrieved February 1, 2016.
  15. ^ a b Special Committee on U.S. Route Numbering (May 24, 2016). "Special Committee on U.S. Route Numbering" (PDF) (Report). Washington, DC: American Association of State Highway and Transportation Officials. Archived from the original (PDF) on December 16, 2017. Retrieved May 26, 2016.
  16. ^ Siceloff, Bruce (May 25, 2016). "Future Interstate Highway Names Approved". The News & Observer. Raleigh, NC. Retrieved May 25, 2016.
  17. ^ Walker, Sam (May 26, 2016). "Future interstate from Chesapeake to Raleigh will be I-87". The Outer Banks Voice. Retrieved August 14, 2017.
  18. ^ "North Carolina Gets Designations for 2 More Interstates". Raleigh, NC: WRAL-TV. May 26, 2016. Retrieved December 2, 2016.
  19. ^ Special Committee on U.S. Route Numbering (May 23, 2017). "Special Committee on U.S. Route Numbering" (PDF) (Report). Washington, DC: American Association of State Highway and Transportation Officials. p. 5. Archived from the original (PDF) on January 13, 2019. Retrieved June 9, 2017.
  20. ^ Hawley, Jon (July 3, 2017). "I-87 work part of DOT's 10-year plan". Elizabeth City Daily Advance. Retrieved September 19, 2017.
  21. ^ "Interstate 87 (North Carolina)" (Map). Google Maps. Retrieved July 24, 2019.
  22. ^ "U.S. 17 Feasibility Study". North Carolina Department of Transportation. N.C. Department of Transportation. Retrieved July 24, 2019.
  23. ^ Hollar, Joseph (May 13, 2023). "Opinion: Interstate 87 could be a highway of opportunities". The Virginian-Pilot. Retrieved October 9, 2023.
  24. ^ Hammond, Sarah (February 5, 2024). "Virginia holds off on developing I-87 connecting Norfolk to Raleigh, but work is underway in North Carolina". 13newsnow.com. Retrieved March 10, 2024.
  25. ^ "I-87 North Carolina Exit List". Retrieved July 18, 2021.
[edit]
KML is from Wikidata