CountryUnited States
LocationChalmers, Indiana
Coordinates40°36′4″N 86°51′57″W / 40.60111°N 86.86583°W / 40.60111; -86.86583
StatusOperational
Commission date2009
OwnerEDP Renewables North America
Wind farm
TypeOnshore
Power generation
Units operational414 turbines
Nameplate capacity801 MW
Capacity factor25.5% (average 2011-2018)
Annual net outputapprox. 1,900 GW·h
External links
Websitemeadowlakewindfarm.com
CommonsRelated media on Commons

Meadow Lake Wind Farm is an 801.25 megawatt (MW) wind farm near Brookston and Chalmers, Indiana, spreading over portions of White, Jasper, and Benton Counties. It is owned and operated by EDP Renewables North America.[1] The facility currently has six operational phases, with 414 turbines, and is a prominent feature on both sides of Interstate 65 in western Indiana.[2]

Phase I

[edit]

Phase I consists of 121 Vestas V82-1.65 MW wind turbines, for a total nameplate capacity of 199.65 MW.[3][4] Groundbreaking ceremonies occurred on April 14, 2009.[5] Phase I became operational in October 2009.[6]

Horizon built a substation next to an existing AEP substation which was already within the wind farm site area. This allowed the wind farm to connect to the power grid without the need to build lengthy new transmission line at a cost of $1 million per mile.[1]

Phase II

[edit]

Meadow Lake II Wind Farm has an installed capacity of 99 MW – enough to power approximately 27,000 average Indiana homes with clean energy. The wind farm, which consists of 66 Acciona AWs-1.5 MW turbines, achieved commercial operation in June 2010.[4]

Phase III

[edit]

Meadow Lake III Wind Farm has an installed capacity of 103.5 MW – enough to power approximately 28,000 average Indiana homes with clean energy. The wind farm, which consists of 69 GE Energy SLE-1.5 MW turbines, achieved commercial operation in October 2010.[4]

Phase IV

[edit]

Meadow Lake IV Wind Farm has an installed capacity of 98.7 MW – enough to power approximately 27,000 average Indiana homes with clean energy. The wind farm, which achieved commercial operation in October 2010, consists of 47 Suzlon S88-2.1 MW turbines.[4]

Phases V and VI

[edit]

Meadow Lake V and VI have installed capacities of 100 MW and 200.4 MW, respectively. Phase V came fully online in 2018 and consists of 50 Vestas V110-2.0 MW turbines.[7] Phase VI came fully online in 2019 and consists of 61 turbines (12 Vestas V110-2.0 MW wind turbines and 49 Vestas V136-3.6 MW) that include some of the tallest and most powerful in the state.[3][8]

Future expansion

[edit]

In early 2010, an EDP Renewables representative and local renewable energy advocates scouted the Meadow Lake project area for a location to build a visitor center. One possibility was an unused building near the intersection of I-65 and US-231 (40°40′04″N 87°02′27″W / 40.667692°N 87.04073°W / 40.667692; -87.04073), near where a wind turbine will be installed within the next year.[1]

Environmental impact

[edit]

At a planned ultimate nameplate capacity of 1000 MW, EDP Renewables North America claims that Meadow Lake would be one of the largest wind farms in the world. The Environmental Protection Agency (EPA) estimates that such facilities would generate enough electricity to power about 250,000 homes,[5] annually saving 1,684 million gallons of water and eliminating 3.1 million tons of carbon dioxide emissions.[9] Horizon further estimates that Phases I and II should eliminate just under one million tons of carbon dioxide emissions per year.[6]

Phase I spreads over 26,000 acres (110 km2) a ten by six mile area since large wind turbines must be spaced at least 5 to 10 rotor diameters apart to avoid wind shadowing. Most of the land between turbines remains productive farmland; only about 250 acres (1.0 km2) of farmland have been taken out of production by the 121 turbines.[1]

Electricity production

[edit]
Meadow Lake Wind Farm Generation (MW·h)
Year Phase I
199.65 MW [10]
Phase II
99 MW [11]
Phase III
103.5 MW [12]
Phase IV
98.7 MW [13]
Phase V
100 MW [14]
Phase VI
200.4 MW [15]
Total Annual MW·h
2009 133,615* - - - - - 133,615
2010 487,991 129,475* 96,145* 67,139* - - 780,750
2011 471,979 257,837 262,413 221,902 - - 1,214,131
2012 466,874 249,120 257,788 214,956 - - 1,188,738
2013 477,611 180,188 183,092 143,785 - - 984,676
2014 495,416 161,358 170,177 134,214 - - 961,165
2015 512,009 222,262 238,493 188,468 - - 1,161,232
2016 467,962 248,764 266,678 206,549 - - 1,189,953
2017 445,549 252,547 246,972 193,258 134,859* - 1,237,185
2018 446,822 235,645 243,320 192,074 322,909 48,566* 1,489,336
2019 475,363 250,044 271,061 206,423 344,064 607,996 2,154,951
2020 454,807 241,687 259,528 187,807 327,008 619,719 2,090,556
2021 413,434 219,655 233,781 168,130 324,254 598,936 1,958,190
2022 460,692 245,956 278,766 202,332 349,662 671,626 2,209,034
Average Annual Production (phases 1–4, years 2011-2018) ---> 1,119,510
Average Capacity Factor (phases 1–4, years 2011-2018) ---> 25.5%

(*) partial year of operation

See also

[edit]

References

[edit]
  1. ^ a b c d Richards, Rick A. (2010-03-03). "Wind farms are changing Indiana's rural landscape". Farm World. Retrieved 2010-03-16.
  2. ^ "Indiana State Fact Sheet" (PDF). meadowlakewindfarm.com. February 2018.
  3. ^ a b "Meadow Lake Wind Farm - Official website". Retrieved March 24, 2019.
  4. ^ a b c d Horizon Wind Energy. "What we have done". Archived from the original on 2010-01-09.
  5. ^ a b Showalter, Max (2009-04-15). "Groundbreaking held for ambitious White County wind farm". Lafayette Journal & Courier. Retrieved 2010-03-15.
  6. ^ a b Krizen, Julie (2009-10-23). "New wind farm operating in White County; Meadow Lake Wind Farm phase I complete". WLFI-TV. Archived from the original on 2009-10-27. Retrieved 2010-03-15.
  7. ^ "Meadow Lake V". thewindpower.net. Retrieved March 24, 2019.
  8. ^ "Meadow Lake VI began sending power to the grid this week". cummins.com. December 20, 2018.
  9. ^ Lantz, Eric; Tegen, Suzanne (May 2008). "Economic Benefits, Carbon Dioxide (CO2) Emissions Reductions, and Water Conservation Benefits from 1,000 Megawatts (MW) of New Wind Power in Indiana" (PDF). EERE, NREL. Archived from the original (PDF, 503kB) on 2010-05-28. Retrieved 2010-03-17.
  10. ^ "Meadow Lake (I), Annual". Electricity Data Browser. Energy Information Administration. Retrieved March 25, 2019.
  11. ^ "Meadow Lake II, Annual". Electricity Data Browser. Energy Information Administration. Retrieved March 25, 2019.
  12. ^ "Meadow Lake III, Annual". Electricity Data Browser. Energy Information Administration. Retrieved March 25, 2019.
  13. ^ "Meadow Lake IV, Annual". Electricity Data Browser. Energy Information Administration. Retrieved March 25, 2019.
  14. ^ "Meadow Lake V, Annual". Electricity Data Browser. Energy Information Administration. Retrieved March 25, 2019.
  15. ^ "Meadow Lake VI, Annual". Electricity Data Browser. Energy Information Administration. Retrieved March 25, 2019.
[edit]