Jump to content

英文维基 | 中文维基 | 日文维基 | 草榴社区

CPTM Series 2000/2070

From Wikipedia, the free encyclopedia
Series 2000
A Series 2000 train on José Bonifácio station
In service2000–present
ManufacturerCAF/Adtranz/Alstom
Built atHortolândia, São Paulo
Constructed1999–2000
Entered service27 May 2000
Refurbished2009–2015
Number built120 carriages (30 sets)
Number in service72 carriages (18 sets)
Formation4-car sets (MC–R1–R2–MC)
Fleet numbers2001/2002–2059/2060
Capacity998 passengers
OperatorsCPTM
Depots
  • Roosevelt Shelter
  • Engenheiro São Paulo Shelter
Lines servedEx
Specifications
Car body constructionCarbon steel
Train length83,568 mm (274 ft 2.1 in)
Car length
  • 21,174 mm (69 ft 5.6 in) (MC)
  • 20.61 m (67 ft 7 in) (R)
Width3.05 m (10 ft 0 in)
Height4,389 mm (14 ft 4.8 in)
Platform height1.1 m (3 ft 7 in)
EntryStep
Doors8 sets of side doors per car
Wheel diameter915 mm (36.0 in)
Wheelbase2,250 mm (7 ft 5 in)
Maximum speed90 km/h (56 mph)
Traction systemAdtranz 3kV - 11RA GTOVVVF
Traction motors8 × Adtranz 6RIA4555 300 kW (400 hp) asynchronous 3-phase AC
Power output2,400 kW (3,200 hp)
Acceleration0.9 m/s2 (3.0 ft/s2)
Deceleration
  • 0.77 m/s2 (2.5 ft/s2) (service)
  • 1.1 m/s2 (3.6 ft/s2) (emergency)
HVACAir conditioning
Electric system(s)3 kV DC overhead line
Current collector(s)Pantograph
UIC classificationBo′Bo′+2′2′+2′2′+Bo′Bo′
Coupling systemScharfenberg
Track gauge1,600 mm (5 ft 3 in)
Notes/references
Sourced from [1][2] except where noted.

The CPTM Series 2000 is a class of electric multiple units part of the São Paulo Metropolitan Trains rolling stock.[3]

History

[edit]

In 1987, the state government of São Paulo went against the opposition of the São Paulo Metropolitan Company and decided to expand the metro network on the east side of São Paulo. The project estimated the construction of 4 new stations between Itaquera and Guaianases. At the same time, the administration looked for a way to operate the CBTU East Line (Roosevelt–Mogi das Cruzes) in a consortium with the federal company. The measure aimed to divide the passenger demand on the East Side between the East Line and the new expansion of the Metro East-West Line. Later, CBTU backed off on the proposal.[4]

Yet, in 1990, CBTU elaborated the minimum requirements for the acquisition of new trains for the East Line, base for a new express train service studied by the company at the time.[5] In the following year, CBTU looked for financing with the World Bank.[6] The acquisition proposal was approved by the World Bank in 1992, allowing a US$ 281 million financing.[7]

With the process of transfer of the CBTU network from federal to state-level from 1993 to 1994, the newly created CPTM assumed the financing with the World Bank and launched an international bidding process, aiming the supply of 30 air conditioned electric multiple units. The bid was won by Consórcio Ferroviário Espanha-Brasil (Cofesbra), composed by Construcciones y Auxiliar de Ferrocarriles (CAF), Alstom and Adtranz. The contracted costed, as of 2 January 1995, R$ 245,447,871.20 (US$ 267,469,529.1).[8]

The first trains were delivered in mid-1999 and all of the fleet was simultaneously on 27 May 2000, during the opening of the East Express.[9]

Transfer to Line 12-Sapphire

[edit]

From 7 August 2016, with the gradual delivery of the new Series 8500 on Line 11, the Spanish train was transferred to Line 12.[10] The doors of Series 2000 follow a different pattern from other trains and they cause problem on their original line due to the excess of passengers. With the transfer to Line 12, besides being a low traffic line, Series 2000 replaced old Series 4400 EMU, which operated on Line 12 until 2018.[11]

CPTM Series 2070

[edit]
Series 2070
A Series 2000 operating on Line 9-Emerald
In service2008–present
ManufacturerCAF/Bombardier/Alstom
Built atLapa, São Paulo
Constructed2008
Entered service4 April 2008
Number built48 carriages (12 sets)
Number in service40 carriages (10 sets)
Fleet numbers2071/2072–2093/2094
Capacity962 passengers
Specifications
Car body constructionStainless steel
Width3.04 m (10 ft 0 in)
Height3.84 m (12 ft 7 in)
Floor height1.33 m (4 ft 4 in)
Maximum speed120 km/h (75 mph)
Weight355,600 kg (784,000 lb)
Traction systemAlstom ONIX 233 XHP IGBT–VVVF
Deceleration
  • 1.1 m/s2 (3.6 ft/s2) (service)
  • 1.2 m/s2 (3.9 ft/s2) (emergency)
Notes/references
Same specs as 2000 series except where noted

History

[edit]

During the acquisition of the Series 2000 for the East Express, a clause on the contract pointed and additive for the purchase of 12 new trains with 4 cars, predicting the success of the Express due to the government investment and the necessity to acquire more trains. However, the investment didn't come. Series 2000 had the contract signed in 1995, but the additional EMUs (Series 2070) only were delivered in 2008, 13 years later.

CPTM got involved in a controversy right before the delivery of these trains, which the operator had launched a new bid, won by French Alstom, which seemed weird, as half of the operating trains on East Express were from Spanish CAF, first winner of the bid. In the end, the trains were built by the French company in their factory in the district of Lapa, delivered in 2008 and initially operated on Line 9-Emerald, to complement the Series 2100 and Series 3000 EMUs that operated.

In 2010, the 12 units of 4 cars were turned into 6 units of 8 cars, due to the delivery of Series 7000 on Line 9, allowing more capacity in the train and possibility to share it with other lines, as is happened briefly on Line 8-Diamond, returning to Line 9 a little bit later.

Present day

[edit]

The Series 2070, after their brief operation on Line 8 and return to Line 9, they were totally moved to Line 12-Sapphire, where they are still operating and share space with Series 2000, 8500 and 9000.[12] Unit 2091–2092 is out of service since 2012 and unit 2093–2094 serves as a technical reserve in case a 2070 is transferred to maintenance.

Accidents and incidents

[edit]
  • 23 February 2017 – Series 2070 train derails next to Itaim Paulista station. No one was harmed.[13]
  • 20 February 2020 – Small fire in a Series 2000 bogie. No one was harmed. The fire was caused by an overheat in the disk brake system.[14]

Irregular contract

[edit]

The contract additive for the acquisition of the Series 2070 trains was considered irregular for the State Court of Accounts of São Paulo for not complying with the Biddings Law. The State Public Prosecutor's Office of São Paulo opened an investigation on the case. In 2022, a judge of the 7th Public Finances Circuit of the Court of Justice of São Paulo, Emílio Migliano Neto, pleaded guilty former CPTM chairman Mário Manuel Seabra Rodrigues Bandeira, former CAO and CFO Antonio Kanji Hoshikawa and former operation and maintenance director José Luiz Lavorente to a R$ 10 million (US$ 1,936,494.6) fine each. They can still appeal for this ruling.[15][16]

See also

[edit]

References

[edit]
  1. ^ Audiências Públicas (PDF) (Report) (in Brazilian Portuguese). CPTM.
  2. ^ "COMMUTER TRAIN S/2000 CPTM". CAF.
  3. ^ "Frota de Trens". Companhia Paulista de Trens Metropolitanos (in Brazilian Portuguese). Retrieved 8 August 2023.
  4. ^ "Governo apressa metrô na Paulista em prejuízo de linha na periferia". Folha de S. Paulo (in Brazilian Portuguese) (22304): C1. 27 April 1990. ISSN 1414-5723. Retrieved 8 August 2023.
  5. ^ "Projetos: São Paulo" (PDF). Companhia Brasileira de Trens Urbanos (in Brazilian Portuguese): 49. 1990. Archived from the original (PDF) on 26 June 2019. Retrieved 8 August 2023.
  6. ^ "Senhores Acionistas" (PDF). Companhia Brasileira de Trens Urbanos (in Brazilian Portuguese). 1991. p. 6. Archived from the original (PDF) on 26 June 2019. Retrieved 8 August 2023.
  7. ^ "Senhores Acionistas" (PDF). Companhia Brasileira de Trens Urbanos (in Brazilian Portuguese). 1992. p. 8. Archived from the original (PDF) on 26 June 2019. Retrieved 8 August 2023.
  8. ^ Tribunal de Contas do Estado de São Paulo (9 April 1997). "TC-0054081026195". Imprensa Oficial (in Brazilian Portuguese). Diário Oficial do Estado de São Paulo: 18–19. Retrieved 8 August 2023.
  9. ^ "Operação dos Trens" (PDF). Companhia Paulista de Trens Metropolitanos (in Brazilian Portuguese). Retrieved 8 August 2023.
  10. ^ Meier, Ricardo (9 August 2016). "Com chegada dos novos trens, CPTM inicia retirada de frota antiga". Metrô CPTM (in Brazilian Portuguese). Retrieved 8 August 2023.
  11. ^ Lobo, Renato (8 August 2016). "Série 2000 inicia operação na Linha 12 da CPTM". Via Trolebus (in Brazilian Portuguese). Retrieved 8 August 2023.
  12. ^ Lobo, Renato (27 April 2012). "Diz que Linha 12 da CPTM vai receber trens "quase novos"". Via Trolebus (in Brazilian Portuguese). Retrieved 8 August 2023.
  13. ^ Cordeiro, Felipe (23 February 2017). "Trem da CPTM descarrila e interdita trecho da Linha 12-Safira". Estadão (in Brazilian Portuguese). Retrieved 8 August 2023.
  14. ^ Lobo, Renato (20 February 2020). "Princípio de incêndio atinge trem da série 2000 na Linha 12-Safira da CPTM". Via Trolebus (in Brazilian Portuguese). Retrieved 8 August 2023.
  15. ^ "Envolvidos em compra irregular de trens para CPTM são condenados a pedido de Promotoria". Ministério Público de São Paulo (in Brazilian Portuguese). 10 May 2022. Retrieved 8 August 2023.
  16. ^ Bazani, Adamo (10 May 2022). ""Cartel dos Trens de SP": Justiça determina multa de R$ 50 milhões contra empresas e pessoas físicas por compra irregular de trens da CPTM". Diário do Transporte (in Brazilian Portuguese). Retrieved 8 August 2023.
[edit]