Jump to content

英文维基 | 中文维基 | 日文维基 | 草榴社区

Guindy railway station

Coordinates: 13°0′31″N 80°12′47″E / 13.00861°N 80.21306°E / 13.00861; 80.21306
From Wikipedia, the free encyclopedia

Guindy
Indian Railways and Chennai Suburban Railway station
Guindy railway station
General information
LocationAnna Salai, Race View Colony, SIDCO Industrial Estate, Chennai, Tamil Nadu, India
Coordinates13°0′31″N 80°12′47″E / 13.00861°N 80.21306°E / 13.00861; 80.21306
Owned byMinistry of Railways, Indian Railways
Line(s)South and South West lines of Chennai Suburban Railway
Platforms4
Tracks4
Construction
Structure typeStandard on-ground station
ParkingAvailable
Other information
Station codeGDY
Fare zoneSouthern Railways
History
Previous namesSouth Indian Railway
Services
Preceding station Chennai Suburban Following station
Saidapet South Line St. Thomas Mount
Location
Map

Guindy railway station is one of the railway stations of the Chennai BeachChengalpattu section of the Chennai Suburban Railway Network. It serves the neighbourhood of Guindy, a suburb of Chennai. It is located at about 14 km from Chennai Beach terminus and is situated at NH 45 in Anna Salai, with an elevation of 12 m above sea level.

History

[edit]

With the completion of track-lying work of the Chennai BeachTambaram section of the Chennai Suburban Railway Network in March 1931, which began in 1928, the suburban services were started on 11 May 1931 between Beach and Tambaram, and the tracks were electrified on 15 November 1931, with the first MG EMU services running on 1.5 kV DC.[1] The section was converted to 25 kV AC traction on 15 January 1967.[2]

The station

[edit]

Platforms

[edit]

There are a total of 4 platforms and 4 tracks. The platforms are connected by foot overbridge. These platforms are built to accumulate 24 coaches express train. The platforms are equipped with modern facility like display board of arrival and departure of trains.

Station layout

[edit]
G Street level Exit/Entrance & ticket counter
P1 FOB, Side platform | Doors will open on the left
Platform 1 Towards → Chennai Beach
Next Station: Saidapet
FOB, Island platform | P1 Doors will open on the left/right | P2 Doors will open on the right
Platform 2 Towards ← Tambaram / Chengalpattu Jn / Villuppuram Jn
Next Station: St. Thomas Mount
Platform 3 Towards → Chennai Egmore
FOB, Island platform | P3 and P4 | (Express Line)
Platform 4 Towards ← Chengalpattu Junction
P1

Performance and earnings

[edit]

As of 2023, the station had a footfall of 60,000 passengers a day.[3]

Projects and development

[edit]

The task of upgrading of the station was taken up in 2023 under Indian Railway's "Amruth Bharath" scheme at a cost of 135 million.[3][4]

See also

[edit]

References

[edit]
  1. ^ "Electric Traction - I". IRFCA.org. Retrieved 17 November 2012.
  2. ^ "IR Electrification Chronology up to 31.03.2004". History of Electrification. IRFCA.org. Retrieved 17 November 2012.
  3. ^ a b Ayyappan, V. (2 December 2023). "Chennai's Guindy and St Thomas Mount railway stations to get new look, better facilities". The Times of India. The Times Group. Retrieved 12 January 2024.
  4. ^ "AMRIT BHARAT STATIONS". Press Information Bureau. New Delhi. 10 February 2023. Retrieved 8 April 2024.
[edit]