Jones Cut
Appearance
It has been suggested that this article be merged with Waltz & Reece Cut, Armstrong Cut, Bradbury Fill, Colby Cut, Lubber Run Fill, Vail Fill, Ramsey Fill, Pequest Fill, McMickle Cut (Lackawanna Cut-Off), Wharton Fill and Slateford Junction to Lackawanna Cut-Off. (Discuss) Proposed since September 2024. |
Jones Cut is one of the cuts on the Lackawanna Cut-Off railroad line in northwest New Jersey.
Located near milepost 64.8 in Blairstown Township, the cut was constructed between 1908 and 1911 by contractor Hyde, McFarlan & Burke. Some 578,000 cubic yards (442,000 m3) of fill material was removed by blasting with dynamite or other methods. Jones Cut is located on a tangent (straight) section of track, permitting speeds of 80 mph (129 km/h). Blairstown Station sits within the cut.[1]
Jones Cut is named for William Jones, who was the principal owner of the land that was acquired for this cut.[2]
References
[edit]- ^ Taber, Thomas Townsend; Taber, Thomas Townsend III (1980). The Delaware, Lackawanna & Western Railroad in the Twentieth Century 1, p. 35. Muncy, PA: Privately printed. ISBN 0-9603398-2-5.
- ^ 1906 Survey Map of the Delaware Valley Cut-Off, September 1, 1906.