Jump to content

英文维基 | 中文维基 | 日文维基 | 草榴社区

Kirti Nagar metro station

Coordinates: 28°39′18.4″N 77°9′5.4″E / 28.655111°N 77.151500°E / 28.655111; 77.151500
From Wikipedia, the free encyclopedia


Kirti Nagar
Logo of the Delhi Metro Delhi Metro station
Kirti Nagar metro station
General information
Coordinates28°39′18.4″N 77°9′5.4″E / 28.655111°N 77.151500°E / 28.655111; 77.151500
Owned byDelhi Metro
Line(s)Blue Line Green Line
Platforms
Tracks4
Construction
Structure typeElevated (Blue line)
At Grade (Green line)
Platform levels2
ParkingCar parking Available
Bicycle facilitiesYes
AccessibleYes Disabled access
Other information
Station codeKNR
History
Opened
  • 31 December 2005 (2005-12-31) (Blue Line)
  • 27 August 2011 (2011-08-27) (Green Line)
Electrified25 kV 50 Hz AC through overhead catenary
Passengers
October 201953,885[1]
October 202350,215[1]Decrease 6.8%
Services
Preceding station Logo of the Delhi Metro Delhi Metro Following station
Moti Nagar Blue Line Shadipur
Satguru Ram Singh Marg Green Line Terminus
Location
Map

The Kirti Nagar metro station is an interchange station between the Blue Line and Green Line of Delhi Metro.[2][3] It is one of the eastward terminal stations of the Green Line, the other being Inderlok, and was opened as a part of a small 3.41 km (2.12 mi) branch from this station to Ashok Park Main station on 27 August 2011.[4] This allowed passengers to easily transfer between the Red Line and Blue Line of the network.

The station serves the localities of Kirti Nagar, Moti Nagar, Shadipur, Naraina, and Karampura. Some recreational places near it include Moments mall, Furniture market, Sunday market, and BTW Kirti Nagar.

Station layout

[edit]

Station Layout Blue Line

P Side platform | Doors will open on the left Disabled access
Platform 1
Eastbound
Towards → Noida Electronic City or Vaishali
Next Station: Shadipur
Platform 2
Westbound
Towards ← Dwarka Sector 21
Next Station: Moti Nagar
Side platform | Doors will open on the left Disabled access
C Concourse Fare control, station agent, metro card vending machines, crossover
G Street Level Gates

Station Layout Green Line

P Side platform | Doors will open on the left Disabled access
Platform 4
Eastbound
Towards → Train Terminates Here
Platform 3
Westbound
Towards ← Brigadier Hoshiyar Singh
Next Station: Satguru Ram Singh Marg
Side platform | Doors will open on the left Disabled access
C Concourse Fare control, station agent, metro card vending machines, crossover
G Street Level Gates

Facilities

[edit]

The station has the following facilities:[5]

  • Currency chest: A Yes Bank currency chest in the outer area
  • Food & beverages: Multiple establishments on the paid concourse and in the station's outer area
  • Token vending and automatic vending machines: Multiple machines on the unpaid concourse
  • Toilets: 2 toilets – both on the paid concourse
  • Other services: An MTNL exchange in the outer area

Entry/Exits

[edit]
Kirti Nagar Station: Entry/Exits[6]
Gate No-1 Disabled access
Furniture market & Moments mall

Connections

[edit]

Bus

[edit]
  • DTC buses: DTC bus routes numbers 72, 78, 78A, 78ASTL, 78STL, 83, 83A, 85, 85BEXT, 85EXT, 108, 114, 116B, 159, 159E, 160, 168, 187, 208, 316, 316A, 318, 408, 408CL, 408EXTCL, 408LSTL, 410, 410ACL, 410CL, 521, 725LSTL, 725STL, 752, 778, 807, 810, 810LSTL, 820, 842, 857, 859, 859A, 871, 871A, 892, 894, 894A, 894CL, 910, 910A, 930, 930A, 940, 940A, 940STL, 943, 944, 953, 953STL, 962, 962B, 970, 970A, 970B, 970C, 975, 980, 985, 990, 990A, 990B, 990CL, 990EXT, 991, and 997 serve the station from nearby Moti Nagar Industrial Area bus stop.[7]

Metrolite

[edit]

The Delhi Metrolite is a planned 19 km (12 mi) Metrolite system with 20 stations that will connect Kirti Nagar to Dwarka ECC via Mayapuri, Hari Nagar, Tihar Jail, and Dwarka Sector 2, Sector 7, Sector 6, Sector 20, and Sector 23.[8] It will be designed as per MoHUA's Metrolite specifications,[9] and will be much cheaper to construct because of its lower speeds and carrying capacities compared to regular metros. The detailed project report (DPR) for this line was approved by DMRC's board in October 2019, and is currently awaiting the Delhi Government's approval.[10]

See also

[edit]

References

[edit]
  1. ^ a b Agarwal, Priyangi (1 December 2023). "How new interchange stations are taking load off Delhi Metro hubs". Times of India. New Delhi. Retrieved 6 December 2023.
  2. ^ "Kirti Nagar". delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 7 December 2023.
  3. ^ "Station Information". Archived from the original on 19 June 2010. Retrieved 26 June 2010.
  4. ^ "Delhi Metro Phase 2 – Information, Route Maps & Updates". themetrorailguy.com. The Metro Rail Guy. Retrieved 7 December 2023.
  5. ^ "Kirti Nagar". delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 10 December 2023.
  6. ^ "Kirti Nagar". delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 7 December 2023.
  7. ^ "Moti Nagar Industrial Area". google.com. businfo.dimts.in. Retrieved 7 December 2023.
  8. ^ Roy, Sidharatha (4 November 2021). "Delhi: Metrolite runs into rough weather before ride starts". Times of India. New Delhi. Retrieved 7 December 2023.
  9. ^ "Standard Specifications - Light Urban Rail Transit System: 'Metrolite'" (PDF). mohua.gov.in. Ministry of Housing & Urban Affairs. Retrieved 7 December 2023.
  10. ^ "Chapter 12, Transport - Economic Survey of Delhi, 2021-22" (PDF). delhiplanning.delhi.gov.in. Delhi Government. 20 March 2023. p. 8. Retrieved 14 December 2023. DMRC has submitted DPR for next 3-corridors of Delhi Metro Phase-IV with the corridor between Rithala and Narela (METRO LITE) and Lajpat Nagar to Saket G-Block and Inderlok to Indraprastha being metro corridors.
[edit]