Jump to content

英文维基 | 中文维基 | 日文维基 | 草榴社区

M7 (railcar)

From Wikipedia, the free encyclopedia
M7
LIRR M7 #7824 arriving at Plandome
Metro-North M7A stopped at Dobbs Ferry station
In service
  • M7: 2002–present
  • M7A: 2004-present
ManufacturerBombardier Transportation
Built atLa Pocatière, Quebec, Canada + Plattsburgh, New York, US)
ReplacedAll remaining M1s
All remaining ACMUs
Constructed1999–2006
Number built
Number in service
Number scrapped
FormationMarried pairs
Fleet numbers
Capacity
  • 110 seated (A car)
  • 101 seated (B car)
OperatorsMTA (LIRR and MNCR)
Specifications
Car body constructionStainless steel
Car length85 ft (25,908 mm)
Width10 ft 6 in (3,200 mm)[1]
Height13 ft 3 in (4,039 mm)
Floor height4 ft 3 in (1,295 mm)
Wheel diameter36 in (914 mm)
Wheelbase8 ft 6 in (2,591 mm)
Maximum speed
  • 100 mph (161 km/h) (design)
  • 80 mph (129 km/h) (service)
Weight
  • 128,300 lb (58,200 kg) (A car)
  • 125,300 lb (56,800 kg) (B car)
Traction systemMitsubishi Electric IGBTVVVF[2][3]
Traction motors
  • 8 × Mitsubishi 265 hp (198 kW) asynchronous 3-phase AC[4]
  • M7: MB-5088-A[5]
  • M7A: MB-5088-A2[5]
Power output2,120 hp (1,580 kW) per unit
Acceleration2 mph/s (3.2 km/(h⋅s))
Deceleration
  • 3 mph/s (4.8 km/(h⋅s)) (service)
  • 3.2 mph/s (5.1 km/(h⋅s)) (emergency)
Electric system(s)Third rail750 V DC
Current collector(s)Contact shoe
UIC classificationBo′Bo′+Bo′Bo′[6]
AAR wheel arrangementB-B+B-B
Braking system(s)Regenerative / Pneumatic
Safety system(s)ATC and Pulse code cab signaling
Coupling systemBudd Pin and Cup coupler
Track gauge4 ft 8+12 in (1,435 mm) standard gauge

The M7 is an electric multiple unit railroad car built by Bombardier for use on the MTA's Long Island Rail Road (LIRR) and Metro-North Railroad. With delivery beginning in 2002, the M7 replaced the M1 railcars on both railroads as well as the ACMUs on Metro-North. The cars built for Metro-North were designated as the M7As, and contain minor differences from the M7s found on the LIRR. A total of 1,172 M7 cars were built for the two railroads.[7]

Description

[edit]

Cars are arranged as married pairs, where each car contains a complete set of controls for an engineer, conductor, or brakeman. However, the 'B' Cars (denoted by odd-numbered car designations) contain a handicapped accessible restroom, which is larger than the restroom provided on the M1 and M3 railcars and designed to accommodate a wheelchair, as well as an attendant and/or service animal (such as a guide dog, hearing dog or service dog) accompanying the passenger. The enlarged bathroom reduces the number of seats in the car.[7]

The M7 was built as two separate but similar models due to the different electrical and signaling systems on the LIRR and Metro-North. These two models, the M7 and M7A, share most of their attributes, but have a few notable differences. Most prominently, the styling of the end of the car is different; on the M7, it is mostly black with a single horizontal yellow stripe, while on the M7A it is mostly blue with several white stripes. This is the primary cosmetic difference, and the cars otherwise look nearly identical. Other, more minor, aesthetic differences include illuminated number boards, present on the M7 but absent on the M7A.[citation needed] Aside from differences in appearance, the cars are built for the different types of third rail used by the two railroads: the M7 is equipped for the LIRR's over-running third rail, while the M7A is equipped for Metro-North's under-running third rail.[7] For this reason, the two cars are not interchangeable between the two railroads.

History

[edit]

Procurement

[edit]

In late 1999, a contract was awarded to Bombardier for 836 LIRR M7s. Delivery began in early 2002, and test trains for the LIRR M7 began on the Ronkonkoma Branch. After several successful tests, LIRR M7 revenue service began on the Long Beach Branch on October 30, 2002, and Metro-North's first M7A started scheduled service in April 2004. All M7s were delivered by early 2007.[citation needed]

Early troubleshooting

[edit]

The M7 cars swayed from side to side more than intended when introduced to service, and required modifications to reduce the sway. In late 2006 the MTA began a replacement of all M7 armrests after paying out over $100,000 to customers who filed complaints. The factory-installed armrests were notorious for slipping into trouser pockets and then tearing them when sitting. The new design is of a different profile and is coated in a more fabric-friendly rubber. Some passengers complained about having fewer seats per B car, a consequence of the larger ADA-compliant restrooms, and about the width of the seats. Metro-North's management received feedback about the M7, which influenced the development of the M8 railcars for the New Haven Line.

In the fall of 2006, the M7As started to experience serious braking problems due to foliage on the right-of-way, a condition known as "Slip-Slide." This caused nearly 2/3 of the Metro-North fleet to be taken out of service, due to flat spots on wheels. While the LIRR fleet performed significantly better, stripped M1s from both railroads were reactivated, and diminished schedules were instituted until the M7 fleet was able to resume full operation.

As of 2007, the fleet has the highest mean distance between failures out of the entire LIRR fleet. This partly had to do with the fleet's newness, and so the fleet often needed to be tested for reliability.[8]

Later history

[edit]

The Metro-North M7As were used in the 2016 film The Girl on the Train.[9]

On April 19, 2021, the LIRR proposed equipping two pairs of M7 railcars with batteries for travel in diesel territory, pending feasibility studies.[10]

Accidents and incidents

[edit]
  • On February 3, 2015, an M7A train on Metro-North's Harlem Line was involved in a grade crossing collision with a car stopped on the tracks in Valhalla, New York. The driver of the car and six passengers were killed and at least fifteen were injured. Car 4333 was destroyed in the subsequent fire.[11]
  • On October 8, 2016, an M7 train on the Long Island Rail Road's Port Jefferson Branch sideswiped a work train near the New Hyde Park station. Multiple cars – 7033, 7034, and 7044 – were seriously damaged and eventually scrapped. Car 7043, which was 7044's mate, was initially stored but was later remated with car 7554 after that car lost its mate.
  • On January 4, 2017, an M7 train on the Long Island Rail Road's Atlantic Branch overshot a bumper at Atlantic Terminal's track 6. More than 100 people were injured. Car 7553 was seriously damaged in the collision – a broken rail pierced the underbody, creating a large hole – and was eventually scrapped. Its mate 7554 was mated with car 7043, which also lost its mate.
  • On July 21, 2018, an M7 train stored in the Long Island Rail Road's West Side Yard derailed. Two cars, 7019 and 7364, were damaged and were eventually scrapped.[12]
  • On February 26, 2019, an M7 train on the Long Island Rail Road's Ronkonkoma Branch struck a truck, causing the lead car to derail and strike the Westbury station platform. Car 7425 was seriously damaged as a result and was eventually scrapped. Three people in the truck were killed, while there were no fatalities on the train. The individuals were fleeing the scene of a motor vehicle accident and went around lowered railroad crossing gates. Car 7426 was mated with car 7279 after the crash.[13]
  • Car 7054 had its front burned in a fire and was scrapped in 2023.[citation needed]
[edit]

See also

[edit]

References

[edit]
  1. ^ "M-7 Electric Multiple Unit - New York, USA". Bombardier. Archived from the original on 2018-01-21. Retrieved 2023-02-04.
  2. ^ Mitsubishi Electric 'Connect' Newsletter, Summer 2006
  3. ^ 25 kV AC ELECTRIFICATION PROJECT ASSESSMENT OF ELECTRIC MULTIPLE UNITS PASSENGER RAIL CARS Page 21-25
  4. ^ APPENDIX 6: Design Data for Electric Multiple Units (EMU) Page 3
  5. ^ a b "Overhaul of M7 and M8 Railcar Traction Motors". New York Bids. MTA - Metro-North Railroad. 12 August 2020.
  6. ^ "Bombardier Transportation Seminar" (PDF). October 11, 2016. Retrieved August 29, 2021.
  7. ^ a b c Solomon, B. (2016). Field Guide to Trains: Locomotives and Rolling Stock. Voyageur Press. p. 75. ISBN 978-0-7603-5126-0. Retrieved December 16, 2018.
  8. ^ Outside Contractor's report Archived 2009-03-05 at the Wayback Machine, October 2007.
  9. ^ 'The Girl On The Train'
  10. ^ Castillo, Alfonso A. (April 19, 2021). "LIRR paying $860G for feasibility study on battery-operated commuter trains". Newsday. Retrieved 2021-04-19.
  11. ^ "Six killed as New York train hits vehicle". BBC News Online. 4 February 2015. Retrieved 4 February 2015.
  12. ^ Marko, Tyler (23 July 2018). "Evening Long Island Rail Road trains canceled due to derailment". liherald.com.
  13. ^ "Witness: Car in train collision was involved in previous crash". News 12 Long Island. February 26, 2019. Archived from the original on February 27, 2019.
[edit]