Jump to content

英文维基 | 中文维基 | 日文维基 | 草榴社区

Massif du Sud Wind Project

Coordinates: 46°36′05″N 70°27′29″W / 46.601389°N 70.458056°W / 46.601389; -70.458056
From Wikipedia, the free encyclopedia

The Massif du Sud Wind Project is a wind project being developed by EDF Énergies Nouvelles and Enbridge.[1] It is located near the villages of Saint-Philémon, Quebec and Saint-Magloire, Quebec. Comprising 75 REpower Systems 2-megawatt wind turbines, at completion the project will achieve a nameplate capacity of 150 MW.[2]

See also

[edit]

References

[edit]
  1. ^ Bloomberg (December 20, 2012). "Enbridge to buy stake in Quebec wind farm". Toronto Star. Retrieved 2013-01-03.
  2. ^ EDF Énergies Nouvelles. "Massif du Sud Wind Project". Archived from the original on 2013-07-05. Retrieved 2013-01-03.

46°36′05″N 70°27′29″W / 46.601389°N 70.458056°W / 46.601389; -70.458056