Jump to content

英文维基 | 中文维基 | 日文维基 | 草榴社区

Murembwe Hydroelectric Power Station

Coordinates: 3°50′46″S 29°34′33″E / 3.845998°S 29.575877°E / -3.845998; 29.575877
From Wikipedia, the free encyclopedia
Murembwe Hydroelectric Power Plant
Murembwe Hydroelectric Power Station is located in Burundi
Murembwe Hydroelectric Power Station
Location of Murembwe Hydroelectric Power Plant in Burundi
Official nameFrench: Centrale Hydroélectrique de Murembwe
CountryBurundi
Coordinates3°50′46″S 29°34′33″E / 3.845998°S 29.575877°E / -3.845998; 29.575877
PurposePower
Owner(s)REGIDESO Burundi
Dam and spillways
ImpoundsMurembwe River
Installed capacity16.5 megawatts (22,100 hp)
Annual generation90.5 GWh

The Murembwe Hydroelectric Power Plant (French: Centrale Hydroélectrique de Murembwe) is a hydroelectric power station in the Bururi Province of Burundi. As of 2024 it was expected to the completed in 2025.

Location

[edit]

The Murembwe Hydroelectric Power Plant is being built as part of the Jiji and Murembwe Hydroelectric Project. It will be owned and operated by REGIDESO Burundi, part of the Ministry of Hydraulics, Energy and Mines.[1] The Mulembwe hydroelectric power station is on the Murembwe River (Mulembwe River), upstream from the Jiji River junction.[2]

Dam

[edit]

The dam is less than 15 metres (49 ft) high and impounds a reservoir of 50,000 cubic metres (1,800,000 cu ft). Up to 8 cubic metres per second (280 cu ft/s) is diverted to the water intake for the plant, while any excess is returned to the river. A minimum flow of 0.424 cubic metres per second (15.0 cu ft/s) is guaranteed for the river section between the dam and the power station.[3]

Plant

[edit]

The plant is about 1.5 kilometres (0.93 mi) downstream from the dam. Water is taken there by a 1.13 kilometres (0.70 mi) underground gallery with a diameter of 2.8 metres (9 ft 2 in) to an equilibrium chamber, then by a 600 metres (2,000 ft) surface penstock with 1.6 metres (5 ft 3 in) diameter falling 258 metres (846 ft). The plant will have a capacity of 16.5 MW and estimated annual power is 90.5 GWh.[3]

Transmission

[edit]

A 110 kV power line runs 5.5 kilometres (3.4 mi) north from the Jiji station up the Mulembwe River to the Mulembwe station, where it is joined by a 110 kV power line from that station. The two lines run east 2.3 kilometres (1.4 mi) to the Horezo switchyard on RP 403 highway. From there, lines run north towards Kabezi and Bujumbura, and southeast towards Bururi.[4]

See also

[edit]

References

[edit]

Sources

[edit]
  • Faller, Tanja (2014), Projet de developpement des centrales hydroelectriques de Jiji et Mulembwe (PDF), African Development Bank, retrieved 2024-08-17
  • Projet Hydroélectrique Jiji et Murembwe (in French), REGIDESO, retrieved 2024-08-17