Probolinggo–Banyuwangi Toll Road

From Wikipedia, the free encyclopedia
Probolinggo–Banyuwangi Toll Road
Probowangi Toll Road
Route information
Maintained by PT Jasa Marga Probolinggo Banyuwangi (JPB)
Length163.83 km (101.80 mi)
StatusUnder construction
Major junctions
Northwest endProbolinggo
Major intersectionsPasuruan–Probolinggo Toll Road
Southeast endPort of Ketapang
Location
CountryIndonesia
ProvincesEast Java
Major cities
Highway system

Probolinggo–Banyuwangi Toll Road (Probowangi Toll Road) is a toll road in East Java. The toll road will connect Probolinggo Regency, Situbondo Regency and Banyuwangi Regency. The toll road will be integrated with Port of Ketapang to allow crossing from Java to Bali. The toll road is the final phase of Trans-Java Toll Road with Port of Merak on the western end. It is currently under route planning phase, but the construction of the first phase of this toll road was expected to be operational around 2024.[1]

History

[edit]

The groundbreaking for the first section of the toll road was done on 6 February 2023 by the Minister of Public Works and Housing, Basuki Hadimuljono with expectations that the first phase will be operating in 2024.[2]

Sections

[edit]

The toll road is divided into 6 sections:

  • Section 1: Kraksaan–Paiton, 15.75 km (9.79 mi)
  • Section 2: Paiton–Besuki, 21.89 km (13.60 mi)
  • Section 3: BesukiSitubondo, 43.48 km (27.02 mi)
  • Section 4: Situbondo–Asembagus, 17.65 km (10.97 mi)
  • Section 5: Asembagus–Bajulmati, 43.61 km (27.10 mi)
  • Section 6: Bajulmati–Ketapang, 21.45 km (13.33 mi)

See also

[edit]

References

[edit]
  1. ^ Hilda B. Alexander & Ardiansyah Fadli (29 July 2021). "Akhirnya, Konstruksi Tol Probolinggo-Banyuwangi Dimulai Tahun 2022". Kompas. Retrieved 5 May 2022.
  2. ^ Midaada, Avirista (6 February 2023). "Groundbreaking Tol Probolinggo-Banyuwangi, Menteri Basuki: Harus Dikerjakan Sungguh-Sungguh". Okezone (in Indonesian). Probolinggo. Retrieved 7 February 2023.