Jump to content

英文维基 | 中文维基 | 日文维基 | 草榴社区

The Stourbridge Line

From Wikipedia, the free encyclopedia
The Stourbridge Line
Overview
HeadquartersHonesdale, Pennsylvania
Reporting markDLS
LocaleNortheastern Pennsylvania
Dates of operation1976–
PredecessorStourbridge Railroad
Technical
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Length25 mi (40.2 km)
Other
WebsiteThe Stourbridge Line.net

The Stourbridge Line (reporting mark DLS) is a shortline railroad that operates 25 miles (40 km) of former Erie Lackawanna Railroad trackage between Honesdale and Lackawaxen, Pennsylvania, where it connects with Norfolk Southern Railway. The line was previously owned by the Lackawaxen-Honesdale Shippers Association and operated under contract by Robey Railroads. The operation was contracted to the Morristown & Erie Railway in January, 2009; service ended in 2011. Service was resumed by the Delaware, Lackawaxen & Stourbridge Railroad (DL&S) on May 9, 2015.

Early history

[edit]

The railroad traces its beginnings to the Delaware & Hudson Canal transporting barges of coal up from Pennsylvania and destined for the Hudson River and eventually the ports of New York City. A gravity railroad was built to carry coal over the mountains from Carbondale to Honesdale in 1829. Coal would be transferred from train to canal boat at Honesdale.

The Stourbridge Lion's first run, as depicted by Clyde Osmer DeLand c. 1916

Seeking to haul greater amounts, the idea of steam-powered locomotion was proposed. The leaders in steam technology at the time were in Great Britain, so three engines were ordered and delivered to America. According to the Wayne County Chamber of Commerce, this is the site of "the first commercial locomotive on rails in the western hemisphere",[i] taking place on August 8, 1829. The locomotive was the Stourbridge Lion.[1] A replica of the Stourbridge Lion steam engine is on display in Honesdale to this day. Both the gravity railroad and the canal were shut down by 1898, and the D&H left to pursue other transportation activities.[2]

Erie Railroad era

[edit]

In 1860, the Pennsylvania Coal Company began the construction of a 16-mile-long railroad from Hawley, Pennsylvania, to a connection with the Erie Railroad at Lackawaxen. This new line was quickly leased to the Erie Railroad, and it was operated as its Hawley Branch. In 1868, the charter of the Jefferson Railroad was reactivated and construction progressed from Hawley towards Honesdale, hoping to reach Carbondale. This extension would never be built, even after the Erie took over in 1870. It would continue operation as the Honesdale Branch, and coal was the primary traffic.[3]

Coal traffic declined through the 1930s, but new local business took its place, warranting a five-day-a-week operation. In 1960, the Erie merged with the Delaware, Lackawanna and Western Railroad to form the Erie Lackawanna Railroad (EL). Traffic on the branch remained steady at about 3,000 cars per year.[4]

Hurricane Agnes hit the East on June 22, 1972. After estimating that the damage to EL, principally between Binghamton and Salamanca, New York, amounted to $2 million ($14,568,019 today), EL filed for bankruptcy on June 26, 1972.[5] During the reorganization of the eastern railroads, it was thought that EL might be able to reorganize on its own, and there was a proposal by Chessie System to buy a portion of the EL. However, the operating unions could not reach a compromise, and Chessie canceled the agreement. Also, by 1975, the economy in the eastern United States was affected by the 1973 oil crisis, hurting any hopes of EL being able to independently compete with government-rehabilitated Conrail lines, and EL quickly petitioned to be included in Conrail. Due to the low-density freight traffic, the Honesdale Branch was rejected from Conrail inclusion. Wayne County officials then made plans to purchase the branch from EL to avoid abandonment and to continue serving its remaining customers.[6][7]

Lackawaxen and Stourbridge

[edit]

Proposals for short line operation were solicited from the Delaware Otsego Corporation (DO), Rail Service Associates (operators of the Bath and Hammondsport Railroad) and TransAction Associates. Rail Service Associates (RSA) formed the Delaware, Lackawaxen and Western Railroad to take over operations of the branch, and they began their feasibility study. Early negotiations for subsidy came with the requirement that former union employees be made an offer for work at their current salary and benefit levels. Discussions with Conrail over rate divisions did not end favorably. In March 1976, with less than a month to go before the start up of Conrail, RSA revoked their proposal.[8]

An inquiry was made with Delaware Otsego to see if they were still interested in operating the line. Building off their success with the launch of the Central New York Railroad (CNYK), and the revival of the Cooperstown and Charlotte Valley Railroad (C&CV) and the Fonda, Johnstown and Gloversville Railroad (FJ&G), DO owner Walter Rich was confident that the Honesdale Branch would be profitable.[6] Within two weeks before the deadline, DO formed the Lackawaxen and Stourbridge Railroad (LASB). In anticipation of the start-up, an FJ&G ALCO S-2 locomotive was transferred to Lackawaxen, and an Ex-Reading ALCO RS-3 was purchased from an equipment dealer.[6]

The ownership of the tracks was still in question, so an emergency order was delivered by the Interstate Commerce Commission (ICC) to direct the LASB to operate the branch after March 30, 1976.[9] The first LASB train departed from Lackawaxen on April 1. The railroad's first blow was the loss of the local Agway mill in Honesdale.[10] The railroad was purchased from the estate of EL by the Lackawaxen-Honesdale Shippers Association (LHSA) in 1977, with operation contracted to DO. In 1979, the Wayne County Chamber of Commerce launched seasonal passenger excursion service on the LASB, and DO briefly utilized some Auto-Train dome cars for the excursion trains.[7] From 1980 to 1982, DO used federal funding to upgrade the LASB's trackage to class II standards, which allowed trains to travel on the line at 25 miles per hour (40 km/h).[11]

Post-Delaware Otsego

[edit]

On June 30, 1989, DO ended operations on LASB, and the Stourbridge Railroad assumed operations through contract to Robey Railroads, the operators of the North Shore Railroad.[7] Seasonal passenger excursions continued to run, sponsored by Wayne County. On January 31, 2003, ownership of the line was conveyed from PennDOT to L&S.[12]

Service was suspended in 2005, when a bridge spanning the Wallenpaupack Creek was destroyed after Pennsylvania Power and Light made emergency water releases from the Lake Wallenpaupack Dam following heavy rains in April, 2005; heavy rainfalls in June 2006 further damaged the weakened structure. L&S acquired control of the Stourbridge from Robey in July, 2006.[13]

A grant of $800,000 from the Pennsylvania Department of Community and Economic Development, plus $703,278 worth of FEMA money, were put towards repairing the trestle over Wallenpaupack Creek. In May, 2008, the line was purchased by Paul Brancato, a principal in Ideal Steel Supply Corp., who planned to build a steel fabrication plant at White Mills.

Operation were initially contracted to Central Penn Railroad. The line between Norfolk Southern Railroad and Route 590 in Lackawaxen, Pennsylvania was repaired in anticipation of resumed service. It was suddenly announced, in September, 2008, that operation would transfer from Central Penn Railroad to the Morristown & Erie Railway (M&E); operations began in January, 2009 as the Stourbridge Railway.

Passenger excursions to Hawley and Lackawaxen were operated on behalf of Wayne County.

Suspension and reopening

[edit]

Citing a lack of funds, M&E withdrew service indefinitely in December, 2011. A news story dated September 11, 2012 provided additional details, stating "a lack of money is keeping the Stourbridge Line Railroad excursions in Wayne County idle for the first time in more than 30 years... [T]he train needs repairs, and so do the tracks. One reason those repairs are not being made is because the land the tracks run through is up for sale... With the tracks used by the Stourbridge line being up for sale, and all the repairs that need to be made, no one is sure when, or even if, this train will be back up and running."[14]

The Stourbridge Line resumed operations on May 9, 2015. Operations were inaugurated by the Delaware Lackawaxen & Stourbridge Railroad under the auspices of Myles Group.[15][16]

See also

[edit]

Notes

[edit]
  1. ^ Given that steam locomotives had been in commercial operation in Europe for at least 15 years, this probably should be amended to "in the Americas"

Citations

[edit]
  1. ^ Bailey (2014), pp. 39–46.
  2. ^ Lewis (1978), p. 43.
  3. ^ Lewis (1978), p. 44.
  4. ^ Lewis (1978), p. 45.
  5. ^ Moody's Transportation Manual, 1986, p. 1275
  6. ^ a b c Hartley, Scott (January 1988). "Regionals In Review - The Delaware Otsego Story". Trains. Vol. 48, no. 3. Kalmbach Publishing. p. 30. Retrieved October 8, 2024.
  7. ^ a b c Tupaczewski, Paul R. (2002). New York, Susquehanna and Western In Color. Scotch Plains, New Jersey: Morning Sun Books, Inc. p. 113. ISBN 1-58248-070-2.
  8. ^ Lewis (1978), p. 46.
  9. ^ Lewis (1978), p. 47.
  10. ^ Lewis (1978), p. 53.
  11. ^ Hartley (1988), p. 38.
  12. ^ stb.dot.gov
  13. ^ gpo.gov
  14. ^ wnep.com
  15. ^ Lange, Stacy (May 9, 2015). "Stourbridge Line Back on Track in Wayne County". wnep.com. WNEP-TV. Retrieved 10 May 2015.
  16. ^ Becker, Peter (October 25, 2018). "DL&S looks to expand beyond excursions to full passenger service to NYC". The News Eagle. Retrieved 12 September 2019.

Bibliography

[edit]
  • Bailey, Michael R. (2014). "John Rastrick's Locomotives 1828–29". Loco Motion. The History Press. ISBN 978-0-7524-9101-1.
  • Lewis, Edward A. (1978). "The DO Lines". The Baggage Car.
[edit]