Jump to content

英文维基 | 中文维基 | 日文维基 | 草榴社区

Trans-Sumatra Highway

From Wikipedia, the free encyclopedia
Trans-Sumatra Highway Eastern Route in Aceh Besar, Aceh, Indonesia

The Trans-Sumatra Highway (Indonesian: Jalan Raya Trans-Sumatra) is a primary north–south road in the Indonesian island of Sumatra, 2,508.5  km in length, and connecting the northern island at Banda Aceh to Bandar Lampung in the south, running through many major cities, traversing Medan, Pekanbaru, Jambi, and Palembang along the way (Sumatra East Road). Upgrade work is expected to begin in March 2013 transforming it into a full-fledged highway, including land acquisition.[1]

The road is a major artery, carrying transmigrants from Java to the less densely populated Sumatra, and carrying Sumatran visitors to Jakarta and Java. The eastern and central route of the Trans-Sumatra Highway forms the whole section of the Asian Highway 25 () and ASEAN Highway 151 (AH151), respectively.[2]

It consists of 4 parts, namely Jalan Raya Lintas Barat (Jalinbar), Jalan Raya Lintas Tengah (Jalinteng), Jalan Raya Lintas Timur (Jalintim), and Jalan Raya Lintas Pantai Timur.

Parts of it are being set up for controlled-access highways. The Medan–Binjai Toll Road is 17 km long and set to completed in the end of 2017.[3]

Major cities linked by the roads

[edit]
The Trans-Sumatran Highway at Lubuklinggau, South Sumatra

Controlled-access highway planning

[edit]

In 2012, the Indonesian government had planned to build the Trans-Sumatra toll road that connects Lampung to Aceh along 2,700 kilometers. The government will allocate Rp 150 trillion for the construction of the toll roads.[4] In the early stages, the toll road parts which is ready to be built are Padang–Sicincin Toll Road (27 km) and Medan–Kualanamu–Tebing Tinggi Toll Road.[5]

Progress

[edit]
  • Medan–Tebing Tinggi Toll Road is divided into 2 sections:[6]
    • Section-1: Medan-Perbarakan-Kualanamu (17.8 km) has been kicked off in September 2014 and the land acquisition has reached 83 percent and construction finished reached 15 percent at end of 2014. It was predicted to be finished in June 2016.
    • Section-2: Perbarakan-Tebing Tinggi (43.9 km), the 40-year concession deal has been signed and the land acquisition has reached 81 percent. It was predicted to be finished in 2017.

See also

[edit]

References

[edit]
  1. ^ 'Trans-Sumatra turnpike project set to start', The Jakarta Post, November 3, 2010
  2. ^ Current Status of ASEAN Transport Network (PDF)
  3. ^ Deny, Septian (March 26, 2017). "Tol Medan-Binjai Ditargetkan Rampung Akhir 2017". liputan6.com. Retrieved March 27, 2017.
  4. ^ "Portal Berita Info Publik - Kementerian Komunikasi dan Informatika". Archived from the original on 2015-12-22. Retrieved 2014-01-20.
  5. ^ Jasa Marga Studi Kelayakan Tol Trans Sumatera, Berita Satu, February 2, 2012.
  6. ^ Nadya Natahadibrata (January 6, 2015). "Jasa Marga unit to operate Medan-Tebing Tinggi toll road".