Jump to content

英文维基 | 中文维基 | 日文维基 | 草榴社区

Wupper-Lippe-Express

From Wikipedia, the free encyclopedia
RE 49 Wupper-Lippe-Express
Overview
OwnerVRR
Line numberRE 49
LocaleNorth Rhine-Westphalia, Germany
Service
Operator(s)DB Regio NRW
Rolling stockFlirt 3XL
Technical
Line length86 km (53 mi)
Operating speed160 km/h (99 mph) (max)
Route map

0
Wesel
3
Friedrichsfeld (Niederrhein)
7
Voerde (Niederrhein)
12
Dinslaken
16
Oberhausen-Holten
20
Oberhausen-Sterkrade
26
Oberhausen Hbf
33
Mülheim an der Ruhr-Styrum
37
Mülheim an der Ruhr Hbf
ICE, IC
43
Essen West
45
Essen Hbf
ICE, IC, THA, FLX
51
Essen-Steele
58
Essen-Kupferdreh
66
Velbert-Langenberg
71
Velbert-Neviges
79
Wuppertal-Vohwinkel
86
Wuppertal Hbf
ICE, IC
The Wupper-Lippe-Express in Oberhausen-Sterkrade

The Wupper-Lippe-Express is an hourly Regional-Express service in German state of North Rhine-Westphalia, which forms part of the Rhine-Ruhr S-Bahn. It connects Wesel with Wuppertal Hauptbahnhof via Oberhausen and Essen.

The line is operated by DB Regio NRW on behalf of the Verkehrsverbund Rhein-Ruhr (VRR).

History

[edit]

The RE 49 service was introduced with the timetable change on 15 December 2019.[1] It was introduced together with changes to the S-Bahn network at the 2019 timetable. The service is based on the observation that interchange between the S 3 service from Essen and the RE 5, RE 19 and RB 35 services towards Wesel in Oberhausen was the busiest at any station in the VRR network and this route had no direct service before the introduction of the Wupper-Lippe-Express.[2] In addition, a study found that thinning out the S-Bahn frequencies on the partially parallel S 3 and S 9 services while introducing an express service would result in higher demand.[3] Even before the Wuppertal–Essen line was upgraded to an S-Bahn line, the Initiative S9-Plus lobby group advocated a fast local service between Wuppertal and Essen along with comfortable rolling stock. Originally, the long-planned upgrade of the network would have meant that all cities in the Rhine-Ruhr metropolitan region were served by S-Bahn trains. However, this idea was rejected in the planning phase.

The RE 49 service replaces the Emscher-Niederrhein-Bahn (RB 35) on the Wesel–Oberhausen section and connects the northern section of the S 3 with the southern section of the S 9 in Essen Hauptbahnhof.[1]

DB Regio NRW replaced Abellio Rail NRW as the operator in 2022.[4]

Services

[edit]

The service only runs from Monday to Friday between 5 a.m. and 7 p.m. An extension of the operating times is planned at a later date.[5] A 20-minute frequency is offered from Monday to Friday on the Wesel–Oberhausen section in combination with the Rhein-Express (RE 5 (RRX)) and the Rhein-IJssel-Express (RE 19) services. There will be three trains an hour on the section from Oberhausen to Essen, taking into account the S 3 services. The same applies to the S 9 service between Essen and Wuppertal.[1] The hourly service is added to 30-minute interval services of S 3 and S 9 on these sections, but the RE 49 services do not stop at all stations.[1]

Rolling stock

[edit]

Stadler Flirt 3 sets, which are built to a standard VRR design, are used on the line. The VRR acquired a total of 41 railcars of this type for the following lines: S 2, S 3, S 9, RB 32, RB 40 and RE 49.[6][7][8]

The VRR commissioned the manufacturer Stadler to maintain the rolling stock. The stock are serviced in a workshop on the site of the former Shamrock colliery in Herne.[7][9]

Route

[edit]

The Regional-Express runs on the following lines:

See also

[edit]

Notes

[edit]
  1. ^ a b c d "Neues zum Fahrplanwechsel im Dezember 2019" (in German). Verkehrsverbund Rhein-Ruhr AöR. Retrieved 12 March 2020.
  2. ^ "VRR-Nahverkehrsplan 2017" (PDF) (in German). Verkehrsverbund Rhein-Ruhr AöR. p. 100. Retrieved 12 March 2020.
  3. ^ "VRR-Nahverkehrsplan 2017" (PDF) (in German). Verkehrsverbund Rhein-Ruhr AöR. p. 91. Retrieved 12 March 2020.
  4. ^ "NRW-Aufgabenträger starten betrieblichen Übergang von Abellio-Verkehren bereits im Januar 2022". Verkehrsverbund Rhein-Ruhr (in German). 5 January 2022. Retrieved 10 February 2022.
  5. ^ "VRR-Nahverkehrsplan 2017" (PDF) (in German). Verkehrsverbund Rhein-Ruhr AöR. p. 113. Retrieved 12 March 2020.
  6. ^ "Die neue S-Bahn Rhein-Ruhr" (in German). Verkehrsverbund Rhein-Ruhr AöR. Retrieved 13 March 2020.
  7. ^ a b "Wir stellen vor: Die neuen S-Bahnen" (in German). Verkehrsverbund Rhein-Ruhr AöR. Retrieved 13 March 2020.
  8. ^ "Leistungsdaten" (in German). Abellio GmbH. Retrieved 13 March 2020.
  9. ^ "Glück auf für neue Werkstatt – Stadler und VRR eröffnen Service-Standort in Herne" (in German). Hanse-Medien Verlag & Mobility Service GmbH. Retrieved 13 March 2020.