Jump to content

英文维基 | 中文维基 | 日文维基 | 草榴社区

Line 2 (Zhengzhou Metro)

From Wikipedia, the free encyclopedia
Line 2
 2 
A train of Zhengzhou Metro Line 2
Overview
StatusOperational
OwnerZhengzhou
LocaleZhengzhou, Henan, China
Termini
Stations22
Service
TypeRapid transit
SystemZhengzhou Metro
Operator(s)Zhengzhou Metro Group Corporation
Depot(s)Chengnan Depot
History
Opened19 August 2016; 8 years ago (2016-08-19)
Technical
Line length30.9 km (19.2 mi)[1][2]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts)
Route map

Jiahe
Huijiquzhengfu
Maozhuang
Huangheyingbinguan
Jinwa
Jindalu
Liuzhuang
Liulin
Shamen  4 
 4  (U/C)
Left arrow to Laoyachen
to Langzhuang Right arrow
Beisanhuan Zhengzhou BRT Route B3
Dongfenglu
Guanhutun Zhengzhou BRT Route B2
Huanghelu  5 
 5 
Left arrow Outer loop to Wuyigongyuan
Inner loop to Zhengzhoudong Railway Station Right arrow
Zijingshan  1 
 1 
Left arrow to Henan University of Technology
to New Campus of Henan University Right arrow
Dongdajie  3 
 3 
Left arrow to Henan Sports Center
to Yinggang Right arrow
Longhaidonglu Zhengzhou BRT Route B5 Bus interchange
Erligang
Nanwulibao  5 
 5 
Left arrow Inner loop to Wuyigongyuan
Outer loop to Zhengzhoudong Railway Station Right arrow
Huazhai
Nansanhuan
Zhanmatun
Nansihuan
Chengnan Depot
Continues as  Chengjiao  to Xinzheng International Airport

Line 2 of the Zhengzhou Metro (Chinese: 郑州地铁二号线; pinyin: Zhèngzhōu Dìtiě Èr Hào Xiàn) is a rapid transit line running from north to south of Zhengzhou. It opened on 19 August 2016. The line is currently 30.9 km long with 22 stations.[3][1][2]

Through services are operated on Line 2 and Chengjiao line (part of future Line 9), although they are classified as separate lines.[4]

Map of Zhengzhou Metro Line 2

History

[edit]
Interior of a train on Line 2

The first phase of the line began construction on 28 December 2010, and began operations on 19 August 2016.[5] The second phase of the line began operations on 28 December 2019.

Opening timeline

[edit]
Segment Commencement Length Station(s) Name
Liuzhuang — Nansihuan 19 August 2016 20.649 km (12.83 mi)[1] 16 Phase 1
Jiahe — Liuzhuang 28 December 2019[2] 10.25 km (6.37 mi)[2] 6 Phase 2

Stations

[edit]
Line name Service Route Station
Station name Connections Location
Local Rapid English Chinese
Line 2 0215 Jiahe 贾河 Huiji
0216 Huijiquzhengfu 惠济区政府
0217 Maozhuang 毛庄
0218 Huangheyingbinguan 黄河迎宾馆  7 
0219 Jinwa 金洼
0220 Jindalu 金达路
0221 Liuzhuang 刘庄 Jinshui
0222 Liulin 柳林
0223 Shamen 沙门  4 
0224 Beisanhuan 北三环 Zhengzhou BRT Zhengzhou BRT Route B3, B6
0225 Dongfenglu 东风路  8 
0226 Guanhutun 关虎屯 Zhengzhou BRT Zhengzhou BRT Route B2
0227 Huanghelu 黄河路  5 
0228 Zijingshan 紫荆山  1 
0229 Dongdajie 东大街  3  Guancheng
0230 Longhaidonglu 陇海东路 Zhengzhou BRT Zhengzhou BRT Route B5
0231 Erligang 二里岗  6 
0232 Nanwulibao 南五里堡  5 
0233 Huazhai 花寨
0234 Nansanhuan 南三环
0235 Zhanmatun 站马屯
0236/0936 Nansihuan 南四环
Chengjiao line 0937 Shibalihe 十八里河 Guancheng
0938 Shawoli 沙窝李 Xinzheng
0939 Shuanghudadao 双湖大道
0940 Xiaoqiao 小乔
0941 Hua'nancheng West 华南城西
0942 Hua'nancheng 华南城
0943 Hua'nancheng Dong 华南城东
0944 Mengzhuang 孟庄
0945 Gangqu Bei 港区北  ZXA  Mengzhuang railway station
 Zhengxu 
0946 Kangpinghu 康平湖 Xinzheng / Zhongmu Co.
0947 Lanhegongyuan 兰河公园 Xinzheng
0948 Enpinghu 恩平湖 Zhongmu Co.
0949 Zonghebaoshuiqu 综合保税区
0950 Xinzheng International Airport 新郑机场  ZXA  EZF
Zhengzhou Xinzheng International AirportCGO
 Zhengxu 
Xinzheng
0951 Terminal 3 3号航站楼
0952 Jichang Dong 机场东 Zhongmu Co.
0953 Gangqu Huizhan 港区会展
0954 Zhengzhou Hangkonggang Railway Station 郑州航空港站  ZXA  ZIF

References

[edit]
  1. ^ a b c "郑州地铁2号线19日开通 1、2号线换乘攻略". 2016-08-18.
  2. ^ a b c d "官宣!郑州地铁2号线二期12月28日开通试运营". 2019-12-26.
  3. ^ "郑州地铁2号线8月10日起开始试乘" (in Chinese). Xinhua. Archived from the original on January 18, 2017. Retrieved 18 January 2017.
  4. ^ "郑州地铁2号线将与城郊铁路实行大小交路套跑运行" (in Chinese). Xinhua. Retrieved 18 January 2017.
  5. ^ "郑州双地铁时代来了!". 河南分网. Retrieved 30 December 2017.