Jump to content

英文维基 | 中文维基 | 日文维基 | 草榴社区

SNCF Class Z 26500

From Wikipedia, the free encyclopedia

Class Z24500/26500
Two TER 2N NG from SNCF and CFL at Luxembourg Station CFL
In service2005 - Present
ManufacturerAlstom
Family nameCoradia Duplex
Constructed2004-2010
Number built211 trainsets (723 vehicles)
Number in service211
Formation3, 4, 5 car per trainset
Fleet numbers24501-24799/26501-26633
Capacity339 (3 cars)/450 (4 cars)/570 (5 cars)
OperatorsSNCF
Lines servedTER
Specifications
Train length81.1 m (266 ft 1 in) (3 cars)
107.5 m (352 ft 8 in) (4 cars)
133.9 m (439 ft 4 in) (5 cars)
Width2.806 m (9 ft 2 in)
Height4.30 m (14 ft 1 in)
Doors2 doors per side
Maximum speed160 km/h (100 mph)
Weight193 t (3 car train)
Traction systemAlstom IGBT VVVF
Prime mover(s)2 asynchronous motors 4 FXA 2851 by bogie
Power output2,550 kilowatts (3,420 hp) (3 cars)
3,400 kilowatts (4,600 hp) (4 cars)
4,250 kilowatts (5,700 hp) (5 cars)
Electric system(s)
Current collector(s)pantograph
Braking system(s)disc and electrodynamic
Safety system(s)ETCS 1
Coupling systemScharfenberg type
Multiple workingZ23500/24500/26500/2200 CFL
Track gauge1,435 mm (4 ft 8+12 in)
Z 26531 at Paris Gare du Nord on 5 September 2005.

The SNCF Class Z 26500 and Z 24500 are a series of electric multiple unit (EMU) trains with bi-level carriages, derived from the Coradia Duplex type of Alstom. They are also known as TER 2N NG from their use on regional TER services, bi-level design (2N), and, by replacing the SNCF Class Z 23500, status as a "new generation" (NG) model. The first order from SNCF, commissioned by the French regions, was launched in 2000, the last in 2009, for deliveries that lasted from 2004 to 2010.

SNCF distinguishes between the Z 24500 series with two or three cars, and Z 26500 series with four or five cars. Each car is powered by a twin-engine (850 kW per bogie).

The national railway company of Luxembourg (CFL) joined several orders from SNCF to buy 22 trains for its network, known as CFL Class 2200.

The SJ X40 series of the Swedish railways is also a version of the Z 24500 with features specific to the Swedish climate and network, the 43 trains are the first 100% bi-level trains used in Sweden.

History

[edit]

The success of the SNCF Class Z 23500 first generation two-level TER (TER 2N), as well as the significant need to renew the TER rolling stock, lead SNCF and the manufacturers to define a successor, but of an entirely new design. Indeed, the varied requirements of regions and travellers required the development of a flexible train able to be more accessible to people with reduced mobility (PRM), reach 160 km/h (100 mph) (compared to 140 km/h (90 mph) for TER 2N), cross the borders in the North-East 25 kV AC region, and be more comfortable for routes up to 2 h 30 min. It also needed to offer a variety of passenger areas and be subject to enhanced passive safety, meeting the latest regulations in force. Alstom used its Coradia platform to offer new equipment, a full-scale model of which was assembled in 2002 and then presented to the public and communities to validate the choices of interior fittings.[1]

A first contract of 629 carriages forming 72 trainsets of different configurations was issued in November 2000 on behalf of six regions:[2] Picardie (eight 5-car trains), Provence-Alpes-Côte d'Azur (ten 4-car trains), Centre (seven 4-car trains), Nord-Pas-de-Calais (sixteen 3-car trains), Lorraine (fifteen 3-car trains), Rhône-Alpes (eleven 2-car trains). In addition, the Luxembourg railways (CFL) acquired twelve 3-car trainsets, intended to be pooled with those of the neighboring Lorraine region.

Originally, there were eleven two-car train Z 24500s that the Rhône-Alpes region had purchased in 2000, during the first order. In April 2003, eleven intermediate carriages were ordered to increase these sets from two to three car. The Rhône-Alpes region was the only one to have ordered TER 2N NG with two cars, there are none today.

Ten successive amendments, signed between April 2003 and January 2009, allowed regions to complete their stock, or new regions to place orders; they also allow the Rhône-Alpes region to order intermediate boxes in order to form only 3-car train elements instead of the 2-car train initially planned. Only the Brittany region, initially interested, did not follow up. These amendments brought the total of orders to 791 carriages forming 233 trainsets,[3][4] with two carriages being ordered by CFL in order to reform a complete train set after the Zoufftgen rail accident in October 2006.

Design

[edit]

The TER 2N NG trains were named by SNCF according to their configuration: Z 24500 for the two and three car trainsets and Z 26500 for the four and five car sets. Their Luxembourg counterparts have been named 2200 series.

All these elements are identical . They can travel in multiple with the first generation Z 23500 TER 2N trains. These trainsets are particularly suited to busy inter-city or dense peri-urban services and are suitable for speeds of 160 km/h (100 mph), thanks to their motorization distributed over the whole train, with one motor bogie and one carrier bogie per car.

[edit]

References

[edit]
  1. ^ "SNCF orders 86 double-deck cars for regional express trains" (Press release). Alstom. 23 December 2002.
  2. ^ "France's SNCF awards ALSTOM a major contract for double deck regional trains" (Press release). Alstom. 9 November 2000.
  3. ^ "Final double-deck option exercised". Railway Gazette International. 13 January 2009.
  4. ^ "Alstom delivers 200th double-decker train to France". Metro Magazine. 3 December 2009.